Procurement Summary
Country: Germany
Summary: Construction Work: Ventilation Technology
Deadline: 26 May 2026
Posting Date: 24 Apr 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 140063049
Document Ref. No.: LOT-0001 E84419667
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
CPV Classification
45212212 - Construction work for swimming pool
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
Sorpesee GmbH intends to energetically renovate the indoor swimming pool in Sundern. The building is a 1-story, solid construction with a partial (approx. 70%) basement. The roof structure above the ground floor is made of wood (Binder) has been created. This was designed as a pent roof (above the swimming pool) and as a flat roof. Above the swimming pool there is only an inspection corridor to check the ventilation technology installed there. Below the ground floor However, around 70% of the areas have a basement. The heating technology is located there. The basement is unheated. • Gross volume: 21, 183 m³ • Gross floor area, ground floor: 2, 113 m² • Gross floor area, basement floor: 1, 304 m² • Net floor area according to DIN: 3, 199 m² The focus of the building and its use is the swimming pool itself. This hall has an area of approx. 1, 083 m². The construction task involves the modernization and energy-efficient renovation of the indoor swimming pool in Sundern Facade, roof, inner suspended ceiling and wall cladding as well as the energy supply. The indoor swimming pool from 1975/76 offers three swimming pools: a 25 m long swimming pool with a height-adjustable floor, a jumping pool with a 1 meter, 3-meter and 5-meter diving tower as well as a children's pool. The indoor swimming pool in Sundern is located at Berliner Straße 62 in 59846 Sundern. This is work on ventilation technology. The indoor swimming pool has two central systems. Once for that Indoor swimming pool and the adjoining rooms, which were renovated in 2007. There is also a supply air system for the catering and kitchen area and four exhaust fans for the kitchen, changing room, toilet entrance and toilet training room. The services are primarily about the central system Swimming pool and the supply air system and the exhaust fan of the toilet entrance. Construction work for swimming pool (CPV code: 45212212)
Documents
Tender Notice