Procurement Summary
Country: Germany
Summary: Construction Supervision Vde8.1: Güterzugstr. 5950 and 5955 Conversion South. Preliminary Measures Km G 4.5-Km G 6.7
Deadline: 16 Jan 2026
Posting Date: 15 Dec 2025
Other Information
Notice Type: Tender
TOT Ref.No.: 132068025
Document Ref. No.: 831197-2025
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
In the course of implementing the VDE 8.1 freight train line project, numerous construction measures are necessary in the construction section between km G 4.5 and km G 6.702 (award package 1 - conversion south), which are monitored throughout the entire construction process by construction supervision (BÜW). are monitored. The construction project includes the following trades or basic services: KIB, superstructure, OLA, cable foundation engineering, TK, LST, 50Hz, environmental BÜW, geotechnical BÜW, surveying, waste management, construction operations planning, participation in the Lph. 6 and 7 as well Railway operational services and security monitoring. Award package 1 includes the relocation of the existing route 5950 as well as the construction of a new trough structure and, subsequently, an open-cut tunnel with a length of approximately 505m. The one on it The subsequent Fürth freight train tunnel (6, 500 m long) to be built using mechanical tunneling is part of a different procurement package. Due to the highly complex and interlinked construction process, the overall construction time in award package 1 is approx 10 years. At the beginning of the construction project, initial preliminary measures (in particular the dismantling of existing OLA cross-fields in the Bf Nbg wholesale market and extensive underground cable construction) are required. After the main construction work has been awarded, the existing route will become 5950 initially extensively rebuilt. The continuous main tracks of the route are being moved outwards one after the other while the wheels are rolling in order to create space for the future trough structure. There are also...
Document Type: Contract Notice Reference Number: 25FEI83065 Contract Type: services Doc Title: Construction supervision VDE8.1: Güterzugstr. 5950 and 5955 conversion south. Preliminary measures km G 4.5-km G 6.7 Dispatch Date: 2025-12-11 Publish Date: 2025-12-15 Submission date: 2026-01-16
Documents
Tender Notice