Procurement Summary
Country: Germany
Summary: Construction of Foundations for Office Containers
Deadline: 28 Jul 2026
Posting Date: 27 Jul 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 146000945
Document Ref. No.: BC 122/26
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
Dismantle the fence in the container storage area Dismantle the board and gutter system, partially load it and dispose of it Dismantle the drainage inlet box / partially load and dispose of it including the lower part Paved area in the area of the container installation area and drainage and store on the side for later reinstallation. approx. 15.00 m2 Excavate foundations for containers, load and dispose of the resulting soil Foundations 6m x 0.8mx1m deep approx. 3.00 pieces Concrete supply for sub-foundation 6m x 0.4m x 0.8m concrete C25/30 approx. 4, 500 m3 Supply and install structural reinforcement for all foundations Deliver formwork for the riser foundation and set it up then dismantle again Deliver and install concrete for rising foundation C25/30 Level earth in gaps approx. 40.00 m2 Find and reroute the pipeline for rainwater, install 2 branches to connect the respective new gutter inlets, reinstall the gravel and compact it Deliver and install the drainage inlet including the base in concrete Cl 2/15 approx. 2.00 piece Deliver and install shelves 8x30x100cm for the platform in front of the containers in concrete C12/15 Restore the gutter up to the drain boxes Restore paving surface Connect the fence to the container, set up the end post, shorten the fence at the end post and assemble approx. 2.00 pieces Excavate cable trench according to profile, fill and compact including restoring the existing surface Excavation class 3 - 5, displaced soil becomes the property of the contractor and must be removed, Excavation depth up to 0.8 m. Bottom width of the trench up to 0.3 m. Approx. 20, 000 m Deliver and install Kapuflex empty pipe DNIOO approx. 20.00 m Transport and install existing cables on site Route warning tape according to DIN EN 12613 30 cm above the Lay the cable. Color: yellow Print: Heavy current approx. 20, 000 m Sand for bedding layers, made from #in...
Type of procedure: Own operation rescue service Bahnhofstr. 39 38855 Wernigerode
Documents
Tender Notice