Procurement Summary
Country: Germany
Summary: Construction of a Controlled Flood Retention Basin East of Bornhausen
Deadline: 31 May 2026
Posting Date: 16 Apr 2026
Other Information
Notice Type: Procurement Plan/GPN/PIN
TOT Ref.No.: 139623143
Document Ref. No.: 258289-2026
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
CPV Classification
45246000 - River regulation and flood control works
45246400 - Flood-prevention works
45247200 - Construction work for dams and similar fixed structures
45000000 - Construction work
45240000 - Construction work for water projects
45247000 - Construction work for dams, canals, irrigation channels and aqueducts
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_detailsLogin to see details
Tender Details
Construction of a controlled flood retention basin east of Bornhausen Construction of a dam body with an average height of around 8.0m and a length of around 380m Dam volume: 180, 000 m³ ----- Crossable reinforced concrete culvert structure with three controllable protection systems and flood relief threshold ---- temporary relocation of the water body ---- construction of a company building ---- elevation of the farm road ---- construction of accompanying farm roads ---- creation of two alternative bays ---- Introduction of a coarse screen ---- Creation of temporary construction roads The increasing occurrence of heavy rain events poses increasing challenges for flood protection. There is currently flooding in the Rhüden and Bornhausen areas. Um In order to throttle the outflow of the Schildau before it flows into the Nette, a controlled flood retention basin should be built. Flood protection is to be improved with a storage volume of 810, 000 m³ on around 25ha. There is also a dam body an average height of around 8.0 m and a length of around 380 m, so that a retention basin is created in the main reach. The embankment is planned with a slope of 1:5; the dam volume is approx. 180, 000 m³ inclusive Sealing core and dam base drainage. The work includes, among other things: the elevation of the farm road north of the basin, the construction of accompanying farm roads to the dam structure, the creation of two alternative bays...
Document Type: Prior Information Notice Reference Number: 018_ BornHRB Contract Type: works Authority Type: body-pl-la Doc Title: Construction of a controlled flood retention basin east of Bornhausen Dispatch Date: 2026-04-15 Publish date: 2026-04-16 Submission Date: 2026-05-31
Documents
Tender Notice