Procurement Summary
Country: Liberia
Summary: Construction of 33KV Line from the Power Plant to the Existing Cross-Border Line
Deadline: 18 May 2020
Posting Date: 23 Feb 2020
Other Information
Notice Type: Tender
TOT Ref.No.: 40795403
Document Ref. No.:
Competition: ICB
Financier: African Development Bank (AfDB)
Purchaser Ownership: -
Tender Value: Refer Document
CPV Classification
45251100 - Construction work for power plant
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_detailsLogin to see details
Tender Details
General Procurement Notice for Construction of 8km 33kv Line from the Power Plant to the Existing Cross-Border Line.
Renewable Energy for Electrification in Liberia (REEL Project)
GENERAL PROCUREMENT NOTICE
1. The Republic of Liberia has received an African Development Fund (ADF) grant, ADF Loan, Scaling up
Renewable Energy Program (SREP) grant and Transitional Support Facility (TSF) Pillar I grant (total of UA24.45 Million) from the African Development Bank (AfDB) to finance the Renewable Energy for Electrification in Liberia (REEL Project). The project is financed in the following components: (a) ADF loan amounting to UA 4.59 million, (b) ADF Grant amounting to UA 0.80 million, (c) a TSF Pillar I Grant amounting to UA 1.20 Million, and (d) a SREP Grant of USD 23.5Million (equivalent to UA 17.06 million.
2. The Liberia Renewable Energy for Electrification (REEL) project aims at developing the run-of-river Gbedin Falls HPP with a total capacity of 9.34 MW. Other activities related to the construction of the infrastructures are also envisaged including the electrification of communities located in proximity of the existing distribution network and the capacity building for hydropower plant development and management.
The works will also involve the construction of 8km 33kV evacuation line as well as construction of 18km access road to the project site. The Gbedin Falls site are located at St John River in Nimba County. The Falls are in a remote area of heavy forest 7km from Gbedin village in the district of Sanniquellie Mahn. Access to the site from Monrovia is via the 260km paved road from Monrovia to Ganta, then the 34km unpaved road (under construction) from Ganta to Mr. Kona town, 10km unpaved road from Mr. Kona town to the end of unpaved road and 8km of inaccessible footpath to the project site. The project activities shall be implemented.
3. Procurement of goods, works and the acquisition of consultancy services financed under the project, will be carried out in accordance with the “Procurement Policy and Methodology for the African Development Bank Group Funded Operations” (BPM), dated October 2015 and Procurement through National Competitive Bidding (NCB) and shopping procedures will be carried out using Borrower Procurement System (BPS) comprising its Laws and Regulations Public Procurement Concessions Act of 2005 which was amended and reinstated in year 2010. Bidding documents are expected to be available with effect from March 2020.
4. Interested bidders may obtain further information and should confirm their interest by contacting the Rural and
Renewable Energy Agency (RREA) office or website.
Attn: Samuel B. Nagbe Jr. – PIU Coordinator
LEC Substation
P.O. Box 1280,
Monrovia, Liberia
Tel: +231776309880
E-mail: [email protected], [email protected], [email protected], [email protected],
[email protected]; [email protected]
Website: www.rrealiberia.org
Documents
Tender Notice