Procurement Summary
Country : Brazil
Summary : Company Hiring Aiming at the Supply and Installation of Photovoltaic Power Generation System (S), Connected to the On-Grad Power Dealer Network, According to the Re ...
Deadline : 10 Jul 2025
Other Information
Notice Type : Tender
TOT Ref.No.: 121588088
Document Ref. No. : 90035/2025
Financier : Self Financed
Purchaser Ownership : Public
Tender Value : Refer Document
Purchaser's Detail
Name :Login to see tender_details
Address : Login to see tender_details
Email : Login to see tender_details
Login to see detailsTender Details
Object: Electronic Auction - Company hiring aiming at the supply and installation of photovoltaic power generation system (s), connected to the on -grad power network of the energy concessionaire, in accordance with the transfer instrument No. 4500072685/2023 between the municipality of Diamante D Oeste/PR and Itaipu Itaipu program more than energy.
UASG Code: 989915
Notice from: 25/06/2025 from 08:00 to 12:00 and from 13:30 to 17:00
Proposal Delivery: From 25/06/2025 to 08:00
Supply and installation of solar powervoltaic electric power generation system in a property belonging To the municipality of Diamante D Oeste-PR, with set of plates sized by the executor with power added to at least 48.00 kWp and minimal added power of the inverters of 36.00 kW. draft project and its approval with the Copel concessionaire, including arts, documentation, all equipment, Materials and installation labor in compliance with agreement No. 4500072685/2023 with Itaipu Binacional. It also includes training of at least 01 hour with at least two responsible for the establishment, aiming to guide them on the operation and management of the system. Location: Presidente Municipal School Kennedy (roof), according to the attached sketch
Quantity: 1
Supply and installation of solar photovoltaic power generation system in carport type structure, in a property belonging to the municipality of Diamante D West-PR, with set of plates sized by the executor with power added at least 42.00 kWp and minimum added power of 31.50 kW inverters. Project elaboration and its approval with Copel concessionaire, including arts, documentation, the entire parking structure and equipment, materials and installation labor in compliance with Agreement No. 4500072685/2023 with Itaipu Binacional. It also includes training of at least 01 hour with at least two responsible for the establishment, aiming to guide them Sober ...
Documents
Tender Notice