Procurement Summary
Country: Germany
Summary: Commissioning of Planning Services (Structural Planning)
Deadline: 04 Jun 2026
Posting Date: 28 Apr 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 140269737
Document Ref. No.: 289244-2026
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: EUR 46900
CPV Classification
71320000 - Engineering design services
71322000 - Engineering design services for the construction of civil engineering works
71300000 - Engineering services
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
Commissioning of planning services (structural planning) The municipality of Großenkneten intends to build a new kindergarten on parcels 130/9 and 132/11 (partly), corridor 17, Großenkneten district, on Ahlhorner Straße in Großenkneten. The new one The kindergarten to be built should be based on the Ev., which was built in 2020, in terms of spatial and visual design. Orientate yourself at Am Lemsen 31b kindergarten in the Ahlhorn district (see attached documents). This building was of solid construction Single-storey construction and comprises a total of two groups including adjoining rooms, a children's cafeteria including adjoining rooms, a crèche group including adjoining rooms, an exercise room including adjoining rooms, as well as staff and office rooms. The roof was made of zinc standing seam executed. The facade on the ground floor was clinkered. A panel facade (fiber cement facade panels) was installed on the upper or attic floor. Use of the attic is also not planned in the above-mentioned new building in Großenkneten. It It is expected that the first drafts will be presented by the Department of Architecture in June 2026. Execution is scheduled to begin in the 1st quarter of 2027 (see also the Dates chapter). The room list including the existing room sizes are listed in the tender documents. In addition to construction areas, an area of approx. 763.00 m² gross floor area is assumed in a single-storey construction. The exact room concept with the...
Document Type: Contract Notice Reference Number: 013-2026 Contract Type: services Estimated Value: 46900 - EUR Authority Type: la Doc Title: Commissioning of planning services (structural planning) Dispatch Date: 2026-04-27 Publish Date: 2026-04-28 Submission Date: 2026-06-04
Documents
Tender Notice