Procurement Summary
Country: Oman
Summary: Centrifuge Machine, Oty: 1
Deadline: 05 Jan 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 132817899
Document Ref. No.: 1234/25/0274
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
Centrifuge Machine, Oty: 1 Category : Equipment Last Date Of Submission : 05/01/2026
SQU Product Code : false Description : Centrifuge Machine Quantity : 1 Remark : 1. Performance Specifications Speed: Max Speed: 5, 000 – 30, 000 RPM (depending on type) Speed Control: Digital, adjustable in increments of 10–50 RPM Accuracy: ±20 RPM Run Modes: RPM or RCF (× g) Relative Centrifugal Force (RCF) RCF Range: 500 – 70, 000 × g Conversion: Automatic RPM ↔ RCF based on rotor radius Acceleration / Deceleration Acceleration Profiles: Fast, medium, slow (program-based) Deceleration (braking): Gradual or rapid stop selectable Time to Max Speed: 10–30 seconds typically high speed, speed RCF/G, -20Cto 40C, total weigth 80g 2. Rotor Compatibility Rotor Types Fixed-angle rotor (most common for microtubes, cryovials, conical tubes) Swing-bucket rotor (for blood tubes, plates, larger volumes) Vertical rotor (DNA/RNA separations, ultracentrifugation) Rotor Materials Aluminum alloy or carbon fiber (lightweight, corrosion-resistant) Rotor Capacity Microcentrifuge: 12–48 × 1.5/2.0 mL tubes Clinical centrifuge: 6–12 × 5 mL / 10 mL / 15 mL tubes Large-volume: 4 × 50 mL / 4 × 100 mL Swing bucket: 4 buckets with adapters for various tube sizes 3. Temperature Control (Refrigerated Models Only) Temperature Range: –20 °C to +40 °C Control Resolution: 0.1 °C Cooling Type: Compressor-based or Peltier system Pre-cool Function: Yes Heat Compensation: Maintains temperature during high-speed runs Non-refrigerated units do not include temperature regulation. 4. Control System & Interface - Terms and Conditions: 1. Warranty. 2. Delivery period. 3. Installation and commissioning must be done by the supplier. 4. Pre-installation requirements if any. Invitation Date : 28/12/2025
Documents
Tender Notice