Procurement Summary
Country: Germany
Summary: Carpentry Work Windows, External Doors
Deadline: 10 Feb 2026
Posting Date: 01 Jan 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 132986542
Document Ref. No.: 18_2026
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
##Renovation of the 1st old wing of the Regenbogenschule Harrenacker 1, 37079 Göttingen ##Dismantling, installation/assembly of windows and external doors The client is leaving the two-storey existing building with a basement of the Rainbow School on the property at Harrenacker 1 Renovate in 37079 Göttingen - Elliehausen. The property is located approximately 6 km west of the city center of Göttingen. In the east the property borders on Diedershäuser Straße and in the north on Harrenacker Street. An access road to the neighboring sports field demarcates the school property to the west. The entire school property has a strong topographical character: the terrain rises from the north-eastern corner of the property to the south-west by around 10 m and from the main entrance to the extension building by around 3.50 m. On On the south-eastern edge of the property, the site slopes down by around 4 m to Diedershäuser Str. This embankment is densely overgrown and contains a population of trees worthy of protection. This is the second construction phase of the renovation of the two Includes the Rainbow School's existing building. In the first BA, an extension building was built in the south of the property and the surrounding outdoor area was built. As part of the construction project, the south wing staircase was demolished and a... Connection to the new building established. The existing buildings are two blocks of buildings located in the northern part of the property. Adjacent to the west is the sports hall of Göttinger Sport und Freizeit GmbH & Co. KG (GoeSF). The The northern wing of the building is connected to the sports hall. The southern bar, however, is separated from the sports hall by an approximately 2.5 m wide path. The path leads to the outside area of the new building and is connected by a staircase Differences in height. As part of the renovation of the blocks, the facades of the buildings will be adapted, existing canopies will be demolished and rebuilt ...
Documents
Tender Notice