Procurement Summary
Country: Germany
Summary: Bz Ufr - Bkh Werneck, Restructuring of the Power Grid (Medium Voltage) New Construction of an Independent Energy Supply Building Object Planning Building Interiors - Architectural Services
Deadline: 28 Sep 2023
Posting Date: 26 Aug 2023
Other Information
Notice Type: Tender
TOT Ref.No.: 87857966
Document Ref. No.: 515483-2023
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
CPV Classification
71200000 - Architectural and related services
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
The district of Lower Franconia intends to restructure the power grid at the Schloss Werneck district hospital (with structural and technical adjustments to the existing building and the construction of a new energy supply building at the entrance gate) and the construction of a new independent energy supply buildingit for the clinical area forensics.
It is a subsidized measure. (Free State of Bavaria via AfMRV)
Date preview:
- Start immediately after completion of VgV
- Planning 2024
- Construction during ongoing operations in one go in sections from 2024
- Overall completion 2026
1. The following transformerions are to be revised in the inventory
- Transformer station technical operations building (TBG) - 1B
- Transformer station OP center - 2A / B
- Transformer station B building - 3A / B
- Transformer station staff residential building (PWG) - 4 A / B
- Transformer station H-Bau 5 A / B
In all transformer stations are structural and fire protectionTechnical measures required, including adjustments to access doors and floor ducts, installation of interior walls to separate new switchgear, making cable entries (including digging work), opening / closing wall penetrations, installation of firewalls, plastering / painting work, etc.
A detailedThe first explanation of the individual sub-measures can be found in the tender documents for stage 2.
The total costs for the restructuring of the power grid (including the new construction of the energy supply building at the entrance gate) are currently assumed to be €4.7 million gross.
The proportion of structural...
Document Type : Contract notice
Reference Number : 2023/S 163-515483
Contract Type : Services
71200000 - Architectural and related services
Authority Type : Regional or local authority
Type of Procedure : Competitive procedure with negotiation
Regulation : European Union, with participation by GPA countries
Bid Type : Submission for all lots
Doc Title : Architectural and related services
Dispatch Date : 2023-08-22
Publish Date : 2023-08-25
Submission Date : 2023-09-28
Documents
Tender Notice