Procurement Summary
Country: Germany
Summary: B295 / B464 Closing the Gap in Renningen: Ing-Bws Lph 1 + 2 (Preliminary Building Planning)
Deadline: 20 Jul 2026
Posting Date: 17 Jun 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 143456150
Document Ref. No.: 413618-2026
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
CPV Classification
71000000 - Architectural, construction, engineering and inspection services
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_detailsLogin to see details
Tender Details
B295 / B464 Closing the gap in Renningen: Ing-BWs Lph 1 + 2 (preliminary building planning) Preliminary building planning according to RAB-ING: Lph 1 + 2 object planning + Lph 2 structural planning The state of Baden-Württemberg, represented by the Stuttgart regional council, is planning on behalf of the Federal Republic of Germany to close the gap between B 295 / B 464 near Renningen. The plans to expand the B 295 between Renningen and the A 8 motorway and to build a new B 464 between Renningen and Sindelfingen include linking the B 295 with the B 464 not included. Coming from the A 8, the 3-lane expansion of the B 295 ends east of Renningen, the 2-lane new construction of the B 464 ends coming from the A 81 south of Renningen. The measure represents the closure of the gap between the two projects. The The measure is located in the Böblingen district. The B 295 connects the northern Black Forest region to the A 8 Stuttgart-Karlsruhe and the Stuttgart metropolitan region. The B 464 offers a direct connection to the municipalities of Renningen and Magstadt to the south Direction to the A 81 Stuttgart - Singen. The length of the expansion route is approximately 2, 152 m for the B 295, approximately 920 m for the B 464 and approximately 1, 000 m for the K 1008. The expansion includes several crossing structures, including over a railway line, the Rankbach and over Roads and ramps. After the intersection of the B 295 and the B 464, an extension of the B 295 towards Leonberg is planned with a third lane, which will merge into the three-lane existing structure. The Leonber...
Document Type: Contract Notice Reference Number: RPS44-394-36/18 Contract Type: services Authority Type: ra Doc Title: B295 / B464 Closing the gap Renningen: Ing-BWs Lph 1 + 2 (preliminary building planning) Dispatch Date: 2026-06-15 Publish Date: 2026-06-17 Submission Date: 2026-07-20
Documents
Tender Notice