Procurement Summary
Country: Germany
Summary: B207, Bl 2.5 Ba 1 Route 0-180 to 2+800 (Bw1)+As Avendorf
Deadline: 30 Jun 2026
Posting Date: 01 Jun 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 142417157
Document Ref. No.: 373895-2026
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
CPV Classification
45221111 - Road bridge construction work
45111100 - Demolition work
45233124 - Trunk road construction work
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_detailsLogin to see details
Tender Details
B207, BL 2.5 BA 1 route 0-180 to 2+800 (BW1)+AS Avendorf B207, BL 2.5 BA 1 route 0-180 to 2+800 (BW1)+AS Avendorf 4-lane expansion of B 207 over a length of around 2, 500 m, new construction of K 42 over a length of 400 m. Construction of AS entrance and exit ramps Avendorf with the following main masses: Topsoil removal: 53, 000 m³ Loosening and installing soil: 73, 000 m³ Deliver and install building material: 81, 000 m³ Create drainage channels: 5, 500 m Produce seepage pipelines: 2, 500 m Gravel base layer: 55, 000 m² Asphalt base layer: 78, 500 m³ Asphalt binder course: 73, 500 m Asphalt surface course SMA and AC: 76, 700 m² Asphalt milling: 15, 200 m² Supply and install cable protection pipes: 30, 000 m Construction: 900 m² Demolishing concrete: 1, 500 m³ New construction of the BW 1.207 overpass structure about the K 42: Individual support widths: 28.00 m - 24.00 m (in an arch) Total length between end supports: 52.00 m (in an arch) Clear width between abutments: 31.06 m Width between railings: 28.60 m kl. Clear height: 4.97 m Crossing angle: 51.431 gon Bridge area: around 1, 500 m2 Shallow foundation Demolition of existing bridges BW. no. 1632506, BW. no. 1632507, BW. no. 1632508, BW.- No. 1632509 Doc Title: B207, BL 2.5 BA 1 route 0-180 to 2+800 (BW1)+AS Avendorf Contract Type: works
Document Type: Contract Notice Reference Number: AA08340176 Contract Type: works Authority Type: pub-undert Doc Title: B207, BL 2.5 BA 1 Strecke 0-180 bis 2+800 (BW1)+AS Avendorf Dispatch Date: 2026-05-29 Publish Date: 2026-06-01 Submission Date: 2026-06-30
Documents
Tender Notice