BIELEFELDER BETEILIGUNGS- UND VERMOEGENSVERWALTUNGS GMBH has floated a tender for Awarding of Specialist Planning Services, Technical Equipment, Renewal of the Signal Box in the Light Rail Tunnel (Bielefeld). The project location is Germany and the tender is closing on 18 Apr 2024. The tender notice number is 166448-2024, while the TOT Ref Number is 99093121. Bidders can have further information about the Tender and can request the complete Tender document by Registering on the site.

Expired Tender

Procurement Summary

Country : Germany

Summary : Awarding of Specialist Planning Services, Technical Equipment, Renewal of the Signal Box in the Light Rail Tunnel (Bielefeld)

Deadline : 18 Apr 2024

Other Information

Notice Type : Tender

TOT Ref.No.: 99093121

Document Ref. No. : 166448-2024

Competition : ICB

Financier : Self Financed

Purchaser Ownership : Public

Tender Value : Refer Document

Purchaser's Detail

Purchaser : BIELEFELDER BETEILIGUNGS- UND VERMOEGENSVERWALTUNGS GMBH
Address: Jahnplatz 5
Town: Bielefeld
NUTS-Code: DEA41
Postal Code: 33602
Phone: 000
Germany
Email :corinna.rodach@stadtwerke-bielefeld.de
URL :https://www.stadtwerke-bielefeld.de

Tender Details

Due to the age and increasing difficulties in obtaining spare parts for the 31-year-old relay signal box, it was decided to replace it with a new signal box. At the same time, the outdated filament lamp signals and audio frequency track circuits in the tunnel areareplaced by modern systems in order to ensure the supply of spare parts in the future.

Specialist planning services of the technical equipment service profile in the sense of § 55 HOAI in conjunction with Appendix 15.1 are advertised in service phases 1-8, which are to be commissioned in the following 3 stageslen:

• LPH 1-3 complete

• LPH 4-7 complete

• LPH 8 complete

Assignment of specialist planning technical equipment: renewal of signal box in the light rail tunnel (Bielefeld)

moBiel GmbH operates the BBVG light rail network, with four main lines. The route changes at the end points of the linesdirection either via turning loops or sweeping systems. The tracks of the Bielefeld city railway are in meter gauge and in the tunnel area, selective train control using coupling coils is used. The central relay signal box of the Bielefeld light rail network controls an area of ​​approx.10 kilometers of double track, which is used by all lines.

Due to the age and the increasing difficulties in obtaining spare parts for the 31-year-old relay signal box, we have decided to replace it with a new signal box. At the same time, the veral...
Document type: contract notice Date: 2024-03-20
Submission Date: 2024-04-18