Automatic voltage stabilizer Tender in South Sudan - 87407963

The CORDIAD has issued a Tender notice for the procurement of a Automatic voltage stabilizer in the South Sudan. This Tender notice was published on 18 Aug 2023 and is scheduled to close on 18 Aug 2023, with an estimated Tender value of Refer Document. Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 87407963, while the tender notice number is and Registering on the platform.

Expired Tender

Procurement Summary

Country: South Sudan

Summary: Automatic voltage stabilizer

Deadline: 18 Aug 2023

Posting Date: 18 Aug 2023

Other Information

Notice Type: Tender

TOT Ref.No.: 87407963

Document Ref. No.:

Competition: ICB

Financier: Other Funding Agencies

Purchaser Ownership: Public

Tender Value: Refer Document

Purchaser's Detail

Name: Login to see tender_details

Address: Login to see tender_details

Email: Login to see tender_detailsLogin to see details

Tender Details

Tenders are invited for Automatic voltage stabilizer
1

Automatic voltage stabilizer

AVS

mount the AVS box in the wall closer to the indoor A.C

unit, connect the AVS to the a.c and to the socket using

wires.

N0 1

2

AC- LG . 70% Engergy

saving with DUAL

INVERTER COMPRESSOR

select the right installation area, fix the mounting plate and

drill outlet hole, mounting the indoor a.c unit, choosing the

right installation spot, fixing the wall brackets, mounting

the outdoor unit, connecting the wires, connecting the

copper pipes

N0 1

3

Solar panels 24vdc, 280 watts

cells made in German

set up scaffolding for safety during installation on the roof.

Solar panel mounting system has to be set up, install the

solar panels on the mounting structure, wire the solar

panels, install solar inverter, bond the solar inverter and

solar battery, connect the inverter to the consumer unit,

start and test solar panels

N02 12

4

Solar battery 220AH/12V

vitron

place the metallicframe with wooden top on the right

position, remove the batteries from its box and place them

on the metallic frame, with good spacing, connect the

cable jumpers using bolts and nuts and tighten the jumper

at the terminals, connect the polarities to the charger

controller and the solar inverter.

N0 10

5 Inverter 3.5kva vitron 24Vdc

mount the solar invertor on the a good site on the wall,

connect the inverter to the batteries using electric cables,

connect the output line to the consumer distribution unit,

Item 1

6 Power stabilizer 1.5kva

connect the power stabilizer to the socket outlet from the

wall. Connect the output from the stabilizer to the load(

genexpert machine and workstation PC)

Item 1

7 flexible solar Cable 6mm

connect the flexible solar cable with each solar panels,

connect the cable to the charger controller in the charging

room.

met

er

40

8

Support stand with wooden

top for 12 batteries

place the mettalic stand with wooden top in a suitable

position for the batteries to be placed

N0 1

9

Metallic frame for solar

panel

mount the metallic frame on the roof of the building using

the righ mounting materials

N0 24

10 cable jumpers

use the cable jumpers to connect the batteries in series -

parallel

N0 36

11 cable 2.5mm, twin and earth

connect the internal wiring of the laboratory for lights,

sockets, A.C switch and AVS, from the distribution board

N0 1

12

Charger controller 60AMP

MPPT, 12/24/48vdc

mount the charger controller on the wall using a good

appropriate material connect the solar and batteries using

the connecting wires from the controller

N0

1
1. Work plan:

• One day training of the technicians on the installation requirements of laboratory room

for GeneXpert machine

• Installation of the solar system (solar panel, batteries, invertor, A.C, power controller,

room lights and sockets)

• Inspections, testing for the performance of the system and

• commissioning of laboratory solar system to the authorities

2. Expected working days for installation of one site is 4 days which include.

✓ Day 1- internal installation of battery bank, invertor, charger controller, A.C,

sockets, and lamp holders with connection of the distribution box,

✓ Day 2- solar installation on the roof

✓ Day 3- system allowed to charge fully

✓ Day 4- testing of the system and commissioning to the authorities.

✓ Day 5- depart from that facility.

3. Payment terms

➢ Consultant will be paid per location that he has finished, so the agreement is

based per site
1. Tambura Hospital We Tambura

2. Luonayker Phcc Warrap Gogrial East

3. Renk Civil Hospital Upper Nile Renk

4. Nasir Hospital Upper Nile Nasir

5. Kodok Hospital Upper Nile Fashoda

6. Boma Hospital Jonglei Pibor

7. Akobo Hospital Jonglei Akobo

8. Raja Hospital Wbg Raja

9. Kajo Keji Hospital Ce Kajo Keji

10. Matangai Phcc Lakes Rumbek Centre

11. Chukudum Hospital Ee Budi County

12. Dlbh/Panyangro Hospital Jonglei Duk

13. Terekeka Hospital Ce Terekeka

14. Nyamlel Tb Hospital Nbg Aweil West

15. Cuibet County Hospital Lakes Cuibet

16. Wulu Phcc Lakes Wulu

17. Waat Phcc Ee Kapoeta East

18. Narus Govt Phcc Ee Kapoeta East

Documents

 Tender Notice


Request Demo
GiZ Tenders India

Procurement Documents for South Sudan

Access a comprehensive library of standard procurement documents specific to South Sudan. Here, you'll find all the essential forms, guidelines, and templates required for tender applications and submissions in South Sudan

Explore Procurement Documents for South Sudan


Want To Bid in This Tender?

Get Local Agent Support in South Sudan and 60 More Countries.

View All The Services


View Tenders By


Publish Tenders


Have Any Dispute With The Purchaser?