Procurement Summary
Country: Germany
Summary: Aurich-Haxtum Sewage Treatment Plant: Construction of Digestion Ii - Shell
Deadline: 08 Sep 2026
Posting Date: 07 Aug 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 146759150
Document Ref. No.: 550126-2026
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
CPV Classification
45262310 - Reinforced-concrete work
45262100 - Scaffolding work
45262522 - Masonry work
45262521 - Facing brickwork
45261420 - Waterproofing work
45231300 - Construction work for water and sewage pipelines
45312310 - Lightning-protection works
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
Aurich-Haxtum sewage treatment plant: Construction of Digestion II - shell Construction description The content of the tender is the new construction of the digester at the Aurich Haxtum sewage treatment plant. The Aurich-Haxtum sewage treatment plant cleans the wastewater from the city of Aurich and the surrounding towns. Next to In addition to the predominantly municipal wastewater, dairy wastewater from the local Rücker dairy is also treated at the Aurich sewage treatment plant. The current incoming freight is around 68, 500 EWCSB. To stabilize and reduce the A sludge digestion plant has been in operation at the sewage treatment plant since 1963 to remove the primary sludge from wastewater treatment. Despite ongoing optimizations and renovations, sludge digestion has its performance limits due to increased inflow loads reached. The existing digester capacity is only sufficient to a limited extent for the primary sludge and the flotate sludge resulting from the pretreatment of the dairy wastewater. The digestion process is overloaded at times and leads to difficult operating states. There are currently no reserve capacities available for revisions and maintenance work on the digester (approx. 60 years old). It is currently not possible to use the resulting excess sludge (Sludge) for energy purposes because it... Digester with a digestion time well under 20 days is already overloaded. The entire ÜS sludge is therefore stabilized in a fermentation plant. The operation of sludge incineration requires a lot of space, leads to high sludge disposal...
Document Type: Contract Notice Reference Number: FD15-226-03 Contract Type: works Authority Type: la Doc Title: Kläranlage Aurich-Haxtum: Bau Faulung II - Rohbau Dispatch Date: 2026-08-05 Publish Date: 2026-08-07 Submission Date: 2026-09-08