Procurement Summary
Country: Germany
Summary: Air Conditioning Systems
Deadline: 25 May 2026
Posting Date: 27 Apr 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 140213390
Document Ref. No.: 75/2026
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
CPV Classification
45331000 - Heating, ventilation and air-conditioning installation work
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
Existing structure and renovation concept: The existing ventilation technology in the main building, which exhausts the exhaust air from the interior bathrooms in sections via fire-resistant air ducts and roof fans, will be fundamentally modernized. During the construction of the cinema hall (built in 2014) corresponds to the state of the art and remains in the existing building, a decision will be made about an energetic replacement of the kitchen ventilation in the intermediate building in the further process. The core of the planning is the completely new construction of a central ventilation system including the entire sewer network to supply the hotel rooms and offices. System design and conditioning: The new ventilation center will be used as a partial air conditioning system with highly efficient heat recovery (rotary heat exchanger, heat recovery coefficient 80%). executed. In winter operation, the outside air is preheated from -14 °C to 14 °C and brought to the target temperature of 22 °C via a downstream air heater that is connected to the in-house heating network. In summer there is a cooling down Outside air via the heat exchanger and a cold water air cooler (8/14 °C) to 20 °C. The cooling supply is ensured via central VRF/VRV devices installed outdoors. The primary air prepared in this way is under high pressure Ceiling induction devices in the hotel rooms and offices on the 1st floor. These use the injector effect to suck in room air (secondary air), control the temperature via integrated heat exchangers and individually regulate the heating or cooling load of the rooms to cover. The associated wet cells are ventilated via ventilation grilles in the connecting doors and a controlled exhaust air system. Sound and fire protection as well as MSR technology: Particular attention is paid to acoustics. All the technology is like that designed so that a sound pressure level of 40 dB(A) is not exceeded in the rooms and the strict guidelines of the TA-Lärm (60 ...
Documents
Tender Notice