Procurement Summary
Country: Germany
Summary: Adaptation of the Hws System Sewage Treatment Plant
Deadline: 12 Aug 2026
Posting Date: 01 Jul 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 144347229
Document Ref. No.: 452434-2026
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
CPV Classification
45246400 - Flood-prevention works
45240000 - Construction work for water projects
45233120 - Road construction works
45262212 - Trench sheeting work
45246000 - River regulation and flood control works
45247230 - Dyke construction work
45262600 - Miscellaneous special-trade construction work
45112500 - Earthmoving work
45233200 - Various surface works
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_detailsLogin to see details
Tender Details
Adaptation of the HWS system sewage treatment plant The subject of this tender is the work required to create the flood protection system for the sewage treatment plant (Mörswiesenstrasse) in Aschaffenburg. The main services are as follows Shown: HWS system: Sheet pile wall work: around 6, 500 m² installation of PU22 profile on an axis length of around 790 m, around 700 m² installation of PU28 profile on an axis length of around 80 m. Re-anchoring of the sheet pile wall in some areas: 38 strand anchors with a length of 16 up to 18 m as well as 8 strand anchors with a length of 18 to 20 m (permanent anchors, 3 strands 0.6 ', 35 to 45 ° to the horizontal) Strapping in parts of the cervical spine system: Installation of strapping carriers (HEB240, HEA240/HEA260) with an axis length of around 185 mMobiles Stop beam system over a length of around 1 mEarthworkDike work, such as steepening a land-side embankment and restoring the top of the dike after partial removal during constructionTopsoil removal: around 14, 000 m²Topsoil application: around 11, 000 m²Subsoil removal: around 4, 100 m³Subsoil application: around 1, 200 m³Production of a retention space compensation area: around 1, 400 m³Production and refilling of construction pits to create the pipe/sewer crossings/pump shafts: Soil volume of around 500 m³.Intersections of existing lines/ducts with the sheet pile wallIntersection of a gas line DN200 and Telekom lines (2 pieces, parallel run, OD110) in open construction (for the Telekom lines additionally using jet blasting)Intersection of the...
Document Type: Contract Notice Reference Number: 54-26-B-OV-66 Contract Type: works Authority Type: la Doc Title: Anpassung der HWS-Anlage Klärwerk Dispatch Date: 2026-06-30 Publish Date: 2026-07-01 Submission Date: 2026-08-12
Documents
Tender Notice