Procurement Summary
Country: Germany
Summary: A45; Replacement New Railway Bridge + Temporary Bypass
Deadline: 27 May 2026
Posting Date: 20 Apr 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 139814880
Document Ref. No.: 235-25-0018
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
CPV Classification
45000000 - Construction work
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
A45; Replacement construction of the railway bridge + temporary bypass The tendered services include the dismantling and construction of the replacement construction of the "Darmcher Weg" railway bridge, the construction of the alignment areas and the construction and dismantling of a bypass including the abutment of a temporary bridge to maintain traffic flow on the A45 during the construction period. The “Darmcher Weg” railway bridge is located on the A45 between the junctions (AS) Meinerzhagen (16) and Drolshagen (17). south of the AS Meinerzhagen at km 69, 869. The town of Meinerzhagen lies west of the structure. The bridge carries the A45 over the DB route Meinerzhagen - Krummenerl (DB 2815, DB km 4.168) and the municipal road Darmcher Weg. Below is the one Compilation of the main civil engineering services for the above-mentioned project for information. Approx. 2, 025 [m3] Reinforced and prestressed concrete demolition of existing structure Approx. 1, 920 [m2] Accommodate asphalt pavement on superstructure Approx. 130 [m] Accommodate railing Approx. 250 [m] Dismantling the protective device approx. 11, 505 [m3] Excavation pit approx. 325 [m2] Building pit shoring (support pile wall) approx. 200 [m2] Building pit shoring (bored pile wall tangent) approx. 1, 425 [m] Deep foundation (in-situ concrete piles) approx. 840 [m3] Precast concrete parts Superstructure approx. 3, 090 [m3] Reinforced and prestressed concrete New bridge construction including construction aids approx. 1, 100 [t] Reinforcing steel approx. 50 [t] Prestressing steel (internal) approx. 9, 440 [m3] Install earth material (building backfilling or excavation pit backfilling) approx. 2, 170 [m2] Superstructure sealing approx. 3, 520 [m2] Mastic asphalt (protective and top layer) approx. 24 [St] Elastomer bearings approx. 45 [m] Superstructure approx. 80 [m] Longitudinal drainage pipe (DN 200) approx. 750 [m2] Create and dismantle geosynthetic reinforced earth construction (KBE) Install and remove approx. 7...
Documents
Tender Notice