Procurement Summary
Country: Germany
Summary: A 11 Km 68.9 - Km 73.35 Left Rf - Lot 2 Route and Bridge Construction
Deadline: 28 May 2026
Posting Date: 23 Apr 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 140012218
Document Ref. No.: 280481-2026
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
CPV Classification
45233110 - Motorway construction works
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_detailsLogin to see details
Tender Details
A 11 km 68.9 - km 73.35 left RF - Lot 2 route and bridge construction A 11 km 68.9 - km 73.35 left RF - Lot 2 route and bridge construction A 11 km 68.9 - km 73.35 left RF - Lot 2 route and bridge construction route About 40 trees felled Approximately 877 pieces of rootstocks were cleared approximately 5, 800 m2 cutting growth Remove and dispose of approx. 5, 050 m3 of topsoil deliver approx. 3, 880 m3 of topsoil Approximately 38, 430 m3 of soil will be removed and disposed of Loosen approx. 3, 000 m3 of soil deliver approx. 8, 000 m3 of soil break up approx. 53, 800 m2 of asphalt road approx. 29, 200 m2 Break up and prepare concrete Break up and recycle approx. 7, 000 m2 of concrete/hydraulic bonded base layer Dismantle and recycle approximately 1, 600 m of concrete protective equipment Produce approximately 46, 000 m2 of soil improvement Create approximately 46, 000 m2 of subgrade approx. Remove and dispose of 2, 600 t of hazardous waste (banquet peelings). Remove and recycle approximately 5, 700 t of banquet material Produce approx. 18, 500 m3 of base layers without binders Produce approximately 3, 300 m3 of banquets Install approx. 3, 650 m2 of mastic asphalt approx. 48, 100 m2 Install rolled asphalt (including 41, 300 m2 of surface and binder course compact design) Create approx. 7, 500 m of drainage (drainage/troughs/seepage pipes). approx. 120 hours of production and regulation of shaft structures approx. 3, 300 m of temporary biotope protection fence produce Dismantle and build approx. 3, 300 m of wildlife protection fence Produce approx. 400 m2 of beam wall shoring for culverts Dismantle approx. 2 traffic sign supports (cantilever arms) including foundations...
Document Type: Contract Notice Reference Number: NOO-2026-0088 Contract Type: works Authority Type: pub-undert Doc Title: A 11 km 68, 9 - km 73, 35 li RF - Los 2 Strecken- und Brückenbau Dispatch Date: 2026-04-21 Publish Date: 2026-04-23 Submission Date: 2026-05-28
Documents
Tender Notice