Procurement Summary
Country: Germany
Summary: 2602600112 Dismantling of the 30 Kv Line Brieske - Signal Box 152
Deadline: 05 Mar 2026
Posting Date: 13 Feb 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 135705647
Document Ref. No.:
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
Name of the order: Dismantling of the 30 kV line Brieske - signal box 152 ------------------------------------ Award number: 2602600112 ------------------ Execution time: ------------------ Start: April 27th, 2026 Completion: August 30th, 2026 Specific deadline: Dismantling of the ropes over the DB Bahn during the period of the specified closure break from May 30th, 2026 from 6 a.m. to May 31st, 2026 8 p.m. Place of service: ------------------ DE12, 01968 Senftenberg Section of the former signal box 152, DBAG route and Grubenstrasse Brieske type and Scope of the service: --------------------------------- In order to terminate mining supervision on areas exposed to mining, it is necessary to ensure public safety and implement the final operating plan. With the Due to the decommissioning of various systems (including drainage systems) at the Meuro opencast mine, the overhead lines that supply the systems also lost their function and were taken out of operation. As part of the reusability of the Areas and to ensure public safety, it is planned to use the overhead line route no. 3, which is no longer required: 30 kV overhead line route Brieske-Hörlitz-Senftenberg (part of the former signal box 152, DBAG route and Brieske pit road), as well as dismantling the span in Großräschen using two steel lattice masts. These include the complete dismantling (including ropes, trusses, insulators, masts, etc.) and the demolition of all structures (including mast foundations) as well as the Reusability of the surfaces is planned. - Dismantling of approx. 950 t of foundations - Filling of approx. 415 m³ of foundation pits - Dismantling of the cables over a length of approx. 3, 020 m An essential part of the measure is the dismantling of the conductor cables. This also cross the DB Bahn tracks in one section. The work must be carried out during the closure period specified by DB Bahn (May 30th - 31st, 2026). Eventual positions: 2 masts at Großräschen incl. presence...
Documents
Tender Notice