Procurement Summary
Country: Canada
Summary: Winnipeg Transit - Fort Rouge Garage Pavement Reconstruction - Phase 1
Deadline: 05 Jun 2026
Posting Date: 22 May 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 141840927
Document Ref. No.: 137-2026
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_detailsLogin to see details
Tender Details
D2. SCOPE OF WORKD2.1 The Work to be done under the Contract shall consist of the reconstruction of existing pavement in the following areas surrounding the Fort Rouge Garage:(a) Northwest of the garage outside the wash bay exit and service bay entrances, as identified in the Drawings. Approximate reconstruction area is 2, 000 sq.m.D2.2 The major components of the Work are as follows:(a) Removal of existing asphalt and concrete pavements and curbs within the prescribed work areas.(b) Excavation and placement of geotextile fabric, geogrid, sub-base material, and base course material.(c) Construction of 180 mm concrete pavements (reinforced) and concrete curbs.(d) All work must be carried out per the Construction Staging Plan defined by the Consultant.D2.3 The funds available for this contract are $650, 000.
Reference Number : 0000322713 Location : Canada, Manitoba, Winnipeg Purchase Type : One Time Only- Delivery Date:2026/11/06 Description : D2. SCOPE OF WORKD2.1 The Work to be done under the Contract shall consist of the reconstruction of existing pavement in the following areas surrounding the Fort Rouge Garage:(a) Northwest of the garage outside the wash bay exit and service bay entrances, as identified in the Drawings. Approximate reconstruction area is 2, 000 sq.m.D2.2 The major components of the Work are as follows:(a) Removal of existing asphalt and concrete pavements and curbs within the prescribed work areas.(b) Excavation and placement of geotextile fabric, geogrid, sub-base material, and base course material.(c) Construction of 180 mm concrete pavements (reinforced) and concrete curbs.(d) All work must be carried out per the Construction Staging Plan defined by the Consultant.D2.3 The funds available for this contract are $650, 000.
Documents
Tender Notice