Procurement Summary
Country: Canada
Summary: West Wing Cooling Tower Renewal
Deadline: 20 Sep 2024
Posting Date: 06 Sep 2024
Other Information
Notice Type: Tender
TOT Ref.No.: 106843144
Document Ref. No.: 1099630-273799 RFT
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
- Work of the Contract comprises of the like-for-like replacement of the existing West Wing cooling tower of approximately 90T cooling capacity. - The existing cooling tower is a closed-circuit type, and it is serving a water loop heat pump system. The working fluid is glycol-water solution 50%. The serves 7 laboratories, 365 days, 24h a day. To allow replacement, the laboratories will be placed on standby for a maximum of two days. - The replacement of the tower shall not take more than two days to complete. Include for all necessary crews (welder, electrician, etc.) and material for expedited work. - Organize cooling tower replacement with a crane and all other necessary work to last no more than two days during Family Day long weekend 2025. If the tower arrives earlier, include for storage. The selection of a replacement weekend days is at absolute discretion of the client within project timeline. - Provide detailed work plan to Engineer for review 3 weeks before replacement day. Include to review 7 laboratories served by cooling tower before replacement with facilities staff and coordinate. - For complete Scope of Work refer to all drawings, specification and other contract documents. The Scope of Work shall include, but not be limited to the following: - Make any necessary temporary connections, if any, to run the new tower within two days time. - Disconnect the power, isolate the tower, drain the 50% glycol-water, drain the basin, drain the chemical treatment pipe. - Di...
Solicitation Type : RFT - Request for Tender (Formal)
Reference Number : 0000277734
Location : Canada, Ontario, Kitchener-Waterloo-Barrie
Description : - Work of the Contract comprises of the like-for-like replacement of the existing West Wing cooling tower of approximately 90T cooling capacity. - The existing cooling tower is a closed-circuit type, and it is serving a water loop heat pump system. The working fluid is glycol-water solution 50%. The serves 7 laboratories, 365 days, 24h a day. To allow replacement, the laboratories will be placed on standby for a maximum of two days. - The replacement of the tower shall not take more than two days to complete. Include for all necessary crews (welder, electrician, etc.) and material for expedited work. - Organize cooling tower replacement with a crane and all other necessary work to last no more than two days during Family Day long weekend 2025. If the tower arrives earlier, include for storage. The selection of a replacement weekend days is at absolute discretion of the client within project timeline. - Provide detailed work plan to Engineer for review 3 weeks before replacement day. Include to review 7 laboratories served by cooling tower before replacement with facilities staff and coordinate. - For complete Scope of Work refer to all drawings, specification and other contract documents. The Scope of Work shall include, but not be limited to the following: - Make any necessary temporary connections, if any, to ru...