Procurement Summary
Country: Canada
Summary: Water Treatment Plant Clarifier Rehabilitation
Deadline: 11 Jun 2026
Posting Date: 01 Jun 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 142425366
Document Ref. No.: AB-2026-02734
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_detailsLogin to see details
Tender Details
The Work generally comprises of: Rehabilitation of the existing clarifier which includes the removal of the existing clarifier drive mechanism followed by the installation of an Owner Supplied clarifier drive mechanism, installation of Owner supplied settling tubes, replacement of the sludge blowdown pumps, associated piping/valves, demolition of the existing cathodic protection system and supply and installation of a new cathodic protection, concrete rehabilitation and re-coating, interior metal component assessment and re-coating, associated electrical and controls, and painting of select items and walls. • The Owner Supplied clarifier drive mechanism will be supplied by Ovivo. • The Owner Supplied settling tubes will be supplied by Brentwood Industries. • The Cathodic Protection System shall be coordinated through Corrpro. The Work will be completed within an active Water Treatment Plant with the Water Treatment Plant remaining in operation throughout the full duration of the Work.
Solicitation Type : ITB - Invitation to Bid (Formal) Reference Number : 00005064369 Location : Alberta Purchase Type : Not Stated Dates Publication : 2026/06/01 08:23:00 AM EDT Closing Date : 2026/06/11 04:00:00 PM EDT Contact Information : James Rogers : [email protected] : Description : The Work generally comprises of: Rehabilitation of the existing clarifier which includes the removal of the existing clarifier drive mechanism followed by the installation of an Owner Supplied clarifier drive mechanism, installation of Owner supplied settling tubes, replacement of the sludge blowdown pumps, associated piping/valves, demolition of the existing cathodic protection system and supply and installation of a new cathodic protection, concrete rehabilitation and re-coating, interior metal component assessment and re-coating, associated electrical and controls, and painting of select items and walls. • The Owner Supplied clarifier drive mechanism will be supplied by Ovivo. • The Owner Supplied settling tubes will be supplied by Brentwood Industries. • The Cathodic Protection System shall be coordinated through Corrpro. The Work will be completed within an active Water Treatment Plant with the Water Treatment Plant remaining in operation throughout the full duration of the Work.