Procurement Summary
Country: United Kingdom
Summary: Walpole Bay Sea Wall Replacement and Stabilisation Project
Deadline: 15 May 2026
Posting Date: 03 Apr 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 138945128
Document Ref. No.: T673
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
CPV Classification
45000000 - Construction work
45200000 - Works for complete or part construction and civil engineering work
45243000 - Coastal-defence works
45243300 - Sea wall construction work
45244000 - Marine construction works
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
Thanet District Council wishes to select and appoint a suitable supplier for the provision of civil engineering construction works at Walpole Bay in the Thanet District, including the replacement of a section of sea wall, coping stabilisation, and concrete sea wall repairs, and invites prospective bidders to submit a Tender to meet the Employer-s requirements. In order to maintain the level of coastal protection to the coastline between Newgate and Walpole Bay, a section of sea wall requires replacement. This includes replacement (including the design and manufacture) of precast sea wall coping blocks, replacement or realignment of the upper course of seawall blocks, replacement of the promenade slab, and in-situ concrete repairs. Please note that a previous Walpole Bay Coast Protection Scheme was advertised by UK4: Tender Notice with Notice identifier: 2025/S 000-082414 published on 12 December 2025. This procurement process was terminated under UK12: Procurement termination notice with Notice identifier: 2026/S 000-026997 published on 24 March 2026. The Council has considered the matters from the previous Tender, which resulted in the need to abandon this procurement and believes it has addressed these matters by removing some of the Conditions of Participation and reducing the scope of the works, which the Council now believes is more aligned to the project budget. Note the contract period has also been reduced from 22 weeks to 20 weeks to reflect the reduction in the scop...
Documents
Tender Notice