Procurement Summary
Country: Canada
Summary: Venting Replacement for Boilers 1-4 - Construction Services
Deadline: 17 Jun 2026
Posting Date: 29 May 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 142256456
Document Ref. No.: GOC6042650-CT
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
Work of this Contract includes the like-for-like replacement/repair of the existing bulkhead and related interior finishes at the Level 1 work area, including bulkhead repair, platform repair, drywall installation/repair, sealant work, and painting to match adjacent existing surfaces. Any mechanical, electrical, or other components affected by the restoration must be modified or replaced in accordance with current applicable codes and good practice. The Contractor is also responsible for protecting existing finishes, maintaining safe access and public/tenant use during construction, coordinating any required service interruptions, completing firestopping/sealant/gypsum/painting work as applicable, and cleaning all areas affected by the work to the satisfaction of the Client and Owner. As the structure is 23 years old, there is a potential for future waterproofing replacement. In this regard, the contractor shall identify the areas of potential issues and make a reasonable adjustment to assure there will be no structural members temporarily removed during waterproofing replacement.Please refer to Attachment 3 - List of Specifications and Drawings for more detailed information.
Reference Number : 0000323116 Location : Canada, British Columbia, Vancouver, Coast & Mountains Job Location : 401 Burrard Street, Vancouver, BC V6C 3R2 Description : Work of this Contract includes the like-for-like replacement/repair of the existing bulkhead and related interior finishes at the Level 1 work area, including bulkhead repair, platform repair, drywall installation/repair, sealant work, and painting to match adjacent existing surfaces. Any mechanical, electrical, or other components affected by the restoration must be modified or replaced in accordance with current applicable codes and good practice. The Contractor is also responsible for protecting existing finishes, maintaining safe access and public/tenant use during construction, coordinating any required service interruptions, completing firestopping/sealant/gypsum/painting work as applicable, and cleaning all areas affected by the work to the satisfaction of the Client and Owner. As the structure is 23 years old, there is a potential for future waterproofing replacement. In this regard, the contractor shall identify the areas of potential issues and make a reasonable adjustment to assure there will be no structural members temporarily removed during waterproofing replacement.Please refer to Attachment 3 – List of Specifications and Drawings for more detailed information.
Documents
Tender Notice