Procurement Summary
Country : USA
Summary : Ventilated Enclosure/Paint Booth
Deadline : 08 Jul 2024
Other Information
Notice Type : Tender
TOT Ref.No.: 103425534
Document Ref. No. : W911SG24Q0074
Financier : Self Financed
Purchaser Ownership : Public
Tender Value : Refer Document
Purchaser's Detail
Name :Login to see tender_details
Address : Login to see tender_details
Email : Login to see tender_details
Login to see detailsTender Details
Description
Product DescriptionAIR FILTRATION SYSTEM REQUIREMENTS(VENTILATED ENCLOSURE/PAINT BOOTH)
Many ventilation systems exist and could potentially be used to control the Cr(VI) hazard during aviation maintenance processes. Selection should be done in collaboration with Industrial Hygiene and Safety professionals to ensure the ventilation system meets minimum design criteria. Defense Centers for Public Health-Aberdeen recommends the following minimum design criteria: • American Conference of Governmental Hygienists (ACGIH)® Industrial Ventilation Manual Figure VS-75-01 Large Paint Booth: Minimum cross-sectional velocity of 100 feet per minute (fpm) for a large deep booth with a cross-sectional area greater than 150 square feet (ft2). Airless electrostatic and high velocity low pressure spray paint operations require an air velocity of 100 fpm. • ACGIH® Industrial Ventilation Manual Figure VS-80-01 Abrasive Blasting Room: Cross-sectional minimum velocity of 100 fpm. • American National Standards Institute/American Society of Safety Professionals (ANSI/ASSP) Z9.4-201 I (R2021): Requires a cross-sectional velocity of 100 fpm. Exhaust System - 18, 000 Cubic Feet per Minute or higher to achieve ACGIH recommended TLVs- Must verify accurate testing and sampling data that system will provide clean air below the ACGIH TLVs of 0.0002mg/m3- Multi-stage Particulate filtration exceeds the National Emission Standards for Hazardous Air Pollutants (NESHAP) 319 to ensure Soldiers working outside of the enclosure are not exposed to hexavalent chromium levels in excess of .0002mg/m3.Enclosure - Enclosure must be Cross Draft Negative - Material NFPA 701 Compliant - Recommend size: 10-H x 18-W x 45”L (based on hangar size and unit requirements) Fire Suppression- Dry Chemical to protect both the enclosure and exhaust - Pre-engineered meeting NFPA 17 Standard for Dry Chemical extinguishing
Replacement Filters - 18 Month Supply
Lighting - Eight (8) Lights: 10, 000 lumen...
Active Contract Opportunity Notice ID W911SG24Q0074 Related Notice Department/Ind. Agency DEPT OF DEFENSE Sub-tier DEPT OF THE ARMY Major Command AMC Sub Command ACC Sub Command 2 MISSION & INSTALLATION CONTRACTING COMMAND Sub Command 3 418TH CSB Office W6QM MICC-FT BLISS
General Information
Contract Opportunity Type: Combined Synopsis/Solicitation (Updated)
All Dates/Times are: (UTC-06:00) MOUNTAIN STANDARD TIME, DENVER, USA
Updated Published Date: Jun 28, 2024 11:14 am MDT
Original Published Date: Jun 14, 2024 02:28 pm MDT
Updated Date Offers Due: Jul 08, 2024 04:00 pm MDT
Original Date Offers Due: Jun 26, 2024 10:00 am MDT
Inactive Policy: 15 days after date offers due
Updated Inactive Date: Jul 23, 2024
Original Inactive Date: Jul 11, 2024
Initiative: None
Classification
Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
Product Service Code: 4460 - AIR PURIFICATION EQUIPMENT
NAICS Code: 333413 - Industrial and Commercial Fan and Blower and Air Purification Equipment Manufacturing
Place of Performance: Fort Bliss, Tx 79916 USA
Documents
Tender Notice
W911SG24Q0074-0003-Conformed.pdf
W911SG24Q0074-0003-Amendment.pdf
W911SG24Q0074-0002-Conformed.pdf
W911SG24Q0074-0002-Amendment.pdf
Vendor-Questions-with-Answers-Updated-6.27.24.docx
W911SG24Q0074001-Conformed.pdf
W911SG24Q0074-001-Amendment.pdf
booth-location.pdf
Vendor-Questions-with-Answers.docx