Procurement Summary
Country: Hungary
Summary: Utilization of Geothermal Energy Development
Deadline: 01 Dec 2025
Posting Date: 30 Oct 2025
Other Information
Notice Type: Tender
TOT Ref.No.: 129167850
Document Ref. No.: 719523-2025
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
The municipality of Mezőcsat wants to ensure the heating of the town's public institutions with geothermal energy. For this purpose, they would use the barren hydrocarbon research borehole marked MEZŐCSA - 1 on the border of the settlement. As part of the project, in the northern border of the settlement, approx. 600 m away located in the 1990s, we plan to convert a barren research well for hydrocarbons into a thermal well. A
for a yield of 700 [litres/minute],
We want to connect the thermal water heat source, forecasted at 57 C, to the heat center created in the thermal bath, and connect it to a newly developed district heating system, which will be connected to the 13 It will partially replace the current use of natural gas for heating purposes in municipal properties. Phase 1: WELL TRAINING: After the drilling equipment has been deployed and installed, the 3" Christmas tree mounted on the well must be dismantled, and a blowout preventer must be built on the 9 5/8" pipe head. After that, the exploratory drilling To be cleared up to 1071 m, i.e. up to the roof of the cement plug. The depth of the layers included in the plan in the original geophysical profile must be specified with natural gamma profiling, and then the following holes must be opened in the 7" casing pipe with 24 shots per meter at their actual level. layers: up to 815 820 m, up to 956 967 m, up to 971 976 m, up to 1020 1025 m, up to 1060 1067 m, a total of 33 fm. Perforation should be done gradually from bottom to top. After that, a cleaning compressor must be carried out until the maximum sand-free well performance is achieved. At that time, the preview must be completed wallet...
Document Type: Contract Notice
Reference Number: EKR001069622025
Contract Type: works
Authority Type: ra
Doc Title: Utilization of geothermal energy development
Dispatch Date: 2025-10-28
Publish Date: 2025-10-30
Submission Date: 2025-12-01
Documents
Tender Notice