Procurement Summary
Country : USA
Summary : USCGC Polar Star Boiler Inspection
Deadline : 17 Jul 2025
Other Information
Notice Type : Tender
TOT Ref.No.: 122691339
Document Ref. No. : 70Z08525Q0020189
Financier : Self Financed
Purchaser Ownership : Public
Tender Value : Refer Document
Purchaser's Detail
Name :Login to see tender_details
Address : Login to see tender_details
Email : Login to see tender_details
Login to see detailsTender Details
Description
SOLICITATION ExTENDED UNTIL 17JULY 0800.
UPDATED POP 21JUL-04AUG
USCGC Polar Star Boiler inspection.
POP: 21July-04Aug
Please see Attached SOW for images
General Requirements
1. SCOPE
1.1 Intent. This standard specification invokes general requirements for conducting vessel repairs performed by commercial contractors for Coast Guard vessels.
2. REFERENCES
COAST GUARD DRAWINGS
None
COAST GUARD PUBLICATIONS
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2022, Welding and Allied Processes
Surface Forces Logistics Center Standard Specification 5550 (SFLC Std Spec 5550), 2022, Fire Prevention and Response
OTHER REFERENCES
None
3. REQUIREMENTS
3.1 General. The Contractor must conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability. The requirement of this WI applies to all work under the scope of this contract, whether explicitly stated in all following work items or not, and to all other work subsequently authorized by changes, modifications, or extensions to the contract.
3.2 Welding and brazing requirements. The Contractor must perform all welding and allied processes, and NDE in accordance with SFLC Std Spec 0740.
3.3 Fire Prevention Specification. The Contractor must submit a Fire Prevention Plan in accordance with paragraph 3.1 of SFLC Standard Spec 5550
3.4 Materials. The Contractor must obtain all the materials required to complete this job except for the Government-furnished Property shown in Paragraph 1.2 of Work Item 1, if any specified.
3.5 Period of Performance. The period of performance for this requirement starts on 16 July 2025 and ends on 1 August 2025.
3.6 Location. The Contractor must perform this work while the ...
Active Contract Opportunity
Notice ID : 70Z08525Q0020189
Related Notice
Department/Ind. Agency : HOMELAND SECURITY, DEPARTMENT OF
Sub-tier : US COAST GUARD
Office: SFLC PROCUREMENT BRANCH 2(00085)
General Information
Contract Opportunity Type: Combined Synopsis/Solicitation (Updated)
Updated Published Date: Jul 14, 2025 08:52 am PDT
Original Published Date: Jul 10, 2025 08:24 am PDT
Updated Date Offers Due: Jul 17, 2025 08:00 am PDT
Original Date Offers Due: Jul 14, 2025 08:00 am PDT
Inactive Policy: 15 days after date offers due
Updated Inactive Date: Aug 01, 2025
Original Inactive Date: Jul 29, 2025
Initiative: None
Classification
Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
Product Service Code: J020 - MAINT/REPAIR/REBUILD OF EQUIPMENT- SHIP AND MARINE EQUIPMENT
NAICS Code: 336611 - Ship Building and Repairing
Place of Performance: Vallejo, CA 94592 USA
Documents
Tender Notice
SOW-BoilerInspect_WAGB-399rev1.pdf