Procurement Summary
Country: USA
Summary: Uscgc Healy Co2 Pull System Upgrade
Deadline: 25 Sep 2026
Posting Date: 22 Sep 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 149591565
Document Ref. No.: 70Z08526Q0028325
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_detailsLogin to see details
Tender Details
General Requirements
1. SCOPE
1.1 Intent. This standard specification invokes general requirements for conducting vessel repairs
performed by commercial contractors at a Coast Guard facility for Coast Guard vessels.
2. REFERENCES
COAST GUARD DRAWINGS
None
COAST GUARD PUBLICATIONS
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022,
General Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2022,
Welding and Allied Processes
Surface Forces Logistics Center Standard Specification 5550 (SFLC Std Spec 5550), 2022, Fire
Prevention and Response
OTHER REFERENCES
None
3. REQUIREMENTS
3.1 General. The Contractor must conform to all requirements specified in SFLC Std Spec 0000 and in
this item, as applicable, during the performance of this availability. The requirements of this WI apply to
all work under the scope of this contract, whether explicitly stated in all following work items or not, and
to all other work subsequently authorized by changes, modifications, or extensions to the contract.
3.2 Contractor-provided fire watch personnel. The Contractor must provide fire watch personnel and
equipment.
3.3 Welding and brazing requirements. The Contractor must perform all welding and allied processes, and
NDE in accordance with SFLC Std Spec 0740.
3.4 Fire Prevention Specification. The Contractor must submit a Fire Prevention Plan in accordance with
paragraph 3.1 of SFLC Standard Spec 5550
3.5. Period of Performance. The period of performance for this work starts on 01 Oct 26 and ends on
31 Oct 2026.
3.6. Location. The Contractor must perform the work while the USCGC HEALY is alongside the pier at
Coast Guard Base Seattle
3.7 Ship-check. It is highly recommended the Contractor conducts a ship-check to propose the best
routing for the new pull cables. The Generator rooms have many interferences to consider...