Procurement Summary
Country: USA
Summary: Uscgc Alex Haley Mrg Coolers Repair
Deadline: 12 Mar 2026
Posting Date: 09 Mar 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 137410505
Document Ref. No.: 70Z08526Q0023411
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
TECHNICAL SERVICES
USCGC ALEX HALEY (WMEC-39) - Z12204
REPAIRS TO REDUCTION GEAR COOLERS
Objective. The objective of this requirement is to conduct repairs to the salt water and lube oil shell and tube cooler(s) for a shipboard propulsion reduction gear on CGC Alex Haley.
References. For any listed references to be distributed, the contractor must be registered in the Joint Certification Program (JCP) through Defense Logistics Agency (DLA) and provide your JCP number to the listed point of contact for this work.
COMDTINST 9077.1 (series), Equipment Tag Out Procedures
Technical Publication 0942-LP-013-2010-241-A, Reduction Gear & Associated Equipment - ATS-1-Salvage Tugs
Naval Ships Technical Manual (NSTM) S9086-HY-STM-010, Chapter 254, Condensers, Heat Exchangers and Air Ejectors. (28 March 2024).
NAVSEA S9531-BH-MMI-010, Technical Manual for Heat Exchanger Repair of Heat Exchangers, Coolers, and Distilling Plants, Rev 3.
COMDTINST M10360.3 (series), Coatings and Color Manual
SFLC Standard Specification 6310, Requirements for Preservation of Ship Structures
Background. During an inspection, the ship-s technicians identified multiple tubes leaking and plugged for both port and starboard reduction gear heat exchangers. This requirement is for the contractor to inspect, test, and repair the port and starboard coolers for further operations. Per reference in section 2, only 10% of tubes are allowed to be plugged for efficient heat transfer and reduction gears to operation as designed.
Tasks. The contractor shall provide material and labor services, of which includes but may not limited to:
The contractor must receive the cooler(s) from the USCG and provide a Material Receiving Report to the listed technical points of contact (TPOCs) within 24 hours of receipt.
The contractor must chemically clean and inspect the cooler(s) in accordance with (IAW) references in section 2. Provide a written Condition Found Report ...
Notice ID: 70z08526q0023411
Department/Ind. Agency: homeland security, department of
Original Set Aside: total small business set-aside (far 19.5)
Sub-tier: us coast guard
Office: sflc procurement branch 2(00085)
Product Service Code: j020 - maint/repair/rebuild of equipment- ship and marine equipment
NAICS Code: 336611 - Ship Building and Repairing
Inactive Dates: mar 27, 2026
Inactive Policy: 15 days after date offers due
Documents
Tender Notice
Documents.zip