Procurement Summary
Country: USA
Summary: Uscgc Alder Cargo Hatch Welding
Deadline: 11 May 2026
Posting Date: 01 May 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 140508995
Document Ref. No.: 70z08526Q0024676
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
Statement of Work
USCGC ALDER (WLB 216)
Cargo Hold Hatch Cofferdam Drain Piping Crop & Renew
1. Purpose and Scope
. KTR shall renew necessary portions of the cargo hold hatch cofferdam drain piping
located in compartment 2-30-0-AA, Cargo Hold.
2. Deliverables and Performance Requirements
. Protective measures: The KTR must furnish and install all protective measures IAW
SFLC Std Spec 0000, paragraph 3.3.3 (Vessel component, space, and equipment
protection).
. Interferences: The KTR must handle all interferences IAW SFLC Std Spec0000,
(Interferences).
. Contamination prevention: The KTR must take all precautions to prevent
contamination of personnel and spaces IAW all applicable Federal, state, and local
regulations.
. Fluid handling: The KTR must remove and dispose of removed fluids from the
affected piping system, IAW all applicable Federal, state, and local regulations. Do not
drain any fluids into any spaced, bilge, or exterior location.
. Piping renewal particulars: The KTR must accomplish the following tasks, using
Coast Guard Drawing 225-WLB-528-001, REV K as guidance:
o Crop out necessary length of piping (3” & 2” diameter), to include all necessary
funnel pieces of the cofferdam system.
o Fabricate necessary piping arrangement previously cropped IAW CG Drawing.
o Install all fabricated piping to include all required gaskets/seals IAW CG
Drawing.
o KTR must provide a means of sealing any open piping while any portion of the
system is open (i.e.: upstream valve blind flange).
. Pipe hangers: Furnish, fit, and install new pipe hangers, as necessary.
. Pipe labeling: The KTR must label affected piping as follows:
o Name of the piping system service.
o Destination, where feasible.
o Direction of flow, indicated by an arrow three inches long pointing away from
the lettering.
. Leak Test: After completing all authorized mechanical (i.e. threaded, bolted, etc.)
join...
Notice ID: 70z08526q0024676
Department/Ind. Agency: homeland security, department of
Original Set Aside: total small business set-aside (far 19.5)
Sub-tier: us coast guard
Office: sflc procurement branch 2(00085)
Product Service Code: j020 - maint/repair/rebuild of equipment- ship and marine equipment
NAICS Code: 336611 - Ship Building and Repairing