Procurement Summary
Country: USA
Summary: *UPDATED* 85599 - Removing the Existing Three Span Steel Girder Bridge and Replacing
Deadline: 15 Jan 2016
Posting Date: 09 Jan 2016
Other Information
Notice Type: Tender
TOT Ref.No.: 4904422
Document Ref. No.: 85599, BRM-5099(72)
Competition: ICB
Financier: Self Financed
Purchaser Ownership: -
Tender Value: Refer Document
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
Project consists of removing the existing three span steel girder bridge and replacing it with a three span steel girder bridge with composite reinforced concrete deck, approach roadway and all other incidental items to complete the work. 69 unit tree removal; 2, 147 CY channel excavation; 2, 890 SY erosion control blanket; 360 LB temporary erosion control seeding; 760 Ft perimeter erosion barrier; 221 Ton aggregate subgrade improvement; 731 Ton subbase granular material; 490 Ton aggregate base course; 5, 197 Lb bituminous materials (prime coat); 858 Ton HMA binder course; 242 Ton HMA surface course; 226 SY bridge approach pavement connector (flexible); 1, 017 SY HMA shoulders; 1 removal of existing structures; 76 Ft pipe culvert removal; 1, 165 CY structure excavation; 288.2 CY concrete structures; 392.4 CY concrete superstructures; 989 SY bridge deck grooving; 1, 052 SY protective coat; 170, 963 Lbs furnishing and erecting structural steel; 7, 290 stud shear connectors; 650 Lb hardware; 135, 810 Lb reinforcement bars, epoxy coated; 346 bar splicers; 350 Ft bridge fence railing; 891 Ft furnishing and driving steel metal shells; 12 elastomeric bearing assemblies; 48 anchor bolts; 275 Ft steel plate beam guardrail; 8 traffic barrier terminals; 596 Ft guardrail removal; 3, 200 Ft paint pavement marking line; 1, 085 CY earth excavation; 936 SF segmental concrete block wall; 772 SY bituminous coated aggregate slopewall; traffic control and protection.
Notes: Additional POC: Tim Garman at 217-524-1642 or email [email protected]; Carrie Kowalski or E-mail [email protected]; Ted Walschleger at 217-782-4894, [email protected]. The prequalification cut-off date is 4:30 p.m. prevailing time December 28, 2015. The Joint venture cut-off date is 4:30 p.m. prevailing time January 8, 2016. The Authorization to Bid request cut-off date is 4:30 p.m. prevailing time January 12, 2016. This solicitation has some or all federal funding, additional requirements may apply. DBE goal - 5%.
Plans: From
Owner. See linked files.
Outside Link:
http://www.idot.illinois.gov/Assets/uploads/files/Doing-Business/Letting-&-Bidding-Refere nce/01.15.2016/Vol18n49.pdf
http://www.idot.illinois.gov/Assets/uploads/files/Doing-Business/Letting-&-Bidding-Refere nce/01.15.2016/DBE01152016.pdf
Update
Notes: Addendum A attached.
Owner Type: Public
Documents
Tender Notice