Procurement Summary
Country: USA
Summary: Twin Peaks Promenade [Pla]
Deadline: 14 Jan 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 133159451
Document Ref. No.: SFGOV-0000011188
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
1/5/2026 - Addendum No. 4 Posted: Bid due date extended to January 14, 2026. 1/5/2026 - Addendum No. 3 Posted. 12/31/2025 - Addendum No. 2 Posted. 12/23/2025 - Addendum No. 1 Posted. Twin Peaks Promenade [Citywide PLA] Scope of Work: The Twin Peaks Promenade Project will transform approximately one-third of a mile of the eastern alignment of Twin Peaks Boulevard—permanently closed to vehicular traffic—into a linear park featuring a multi-use recreational trail. Located within an Environmentally Sensitive Area (ESA) that supports the federally protected Mission Blue Butterfly, the project requires careful protection and restoration of natural habitat during construction. Work includes removal of a portion of existing asphalt pavement and installation of stabilized soil trail paving. Most existing concrete barriers and steel guardrails will be removed. Improvements will include new seating areas with benches, concrete seatwalls, wood plank benches, and ornamental boulders. Trail edges will be defined with gabion walls, Sutter walls, and redwood headers, with split-rail fencing installed to protect sensitive habitat areas. The parking lot will be reconfigured and restriped to include an ADA-accessible parking stall and bicycle parking at three locations. Service and emergency vehicle access will be provided at both the north and south ends of the promenade with removable bollards. The project also includes erosion control measures, habitat restoration through native plantings, and installation of wayfinding, interpretive, and trail map signage. The time allowed for completion is 186 consecutive calendar days. The estimated construction cost is approximately $2, 200, 000. A pre-bid meeting will be held on site on Wednesday, December 3, 2025, at 9:00 AM at 501 Twin Peak Boulevard, San Francisco. Meet at the parking area between the two peaks. Class "A" license is required at time of award. 1. DPWs Contracts & Bid Opportunities, https://bidopport...
Start Date : 11/20/2025 12:00AM PST
Due Date : 01/14/2026
Documents
Tender Notice