Procurement Summary
Country: USA
Summary: Turnout 5 Project
Deadline: 05 Aug 2026
Posting Date: 01 Jul 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 144346996
Document Ref. No.: MS26-118
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
The Victorville Water District (District) is implementing the Turnout 5 Project to construct the Districts third connection to the Mojave Water Agencys Regional Recharge and Recovery (R3) system. The project includes installation of a connection to the R3 pipeline along Mesa Street, construction of approximately 1.25 miles of 24-inch diameter mortar-lined and coated welded steel water main, and construction of a new metering facility at the Amethyst Pump Station, located at the northwest corner of Amethyst and Sycamore Street to convey State Water Project, R3 Water, into the City of Victorvilles (City) domestic water system.This project will enable the City to utilize R3 water as a supplemental water supply for the Victorville Water District. The project will deliver R3 water to the storage tanks at the Amethyst Pump Station serving Pressure Zone 3290 and will further distribute it to higher pressure zones via the on-site booster station and to lower pressure zones through pressure reducing valves (PRVs). R3 water may also be utilized for blending with some of the City-s groundwater to reduce arsenic concentrations and meet regulatory requirements, thereby reducing or potentially eliminating the need for the City to operate arsenic treatment plants.
Documents
Tender Notice