Procurement Summary
Country: Hungary
Summary: Tram Line 50 Platform Renovation, Phase Ii
Deadline: 07 Aug 2026
Posting Date: 20 Jul 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 145514808
Document Ref. No.: 500140-2026
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
CPV Classification
45234128 - Tramway platforms construction work
45200000 - Works for complete or part construction and civil engineering work
45233120 - Road construction works
45234126 - Tramline construction works
45234129 - Urban railway track construction works
45316200 - Installation of signalling equipment
45316212 - Installation of traffic lights
45316213 - Installation of traffic guidance equipment
71500000 - Construction-related services
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_detailsLogin to see details
Tender Details
Tram line 50 platform renovation, phase II Budapest, accessibility of tram line 50 phase II In the present project, on the section of tram line 50 between the Határ út and Szarvas csárda tér stops, it was left out of the previous constructions bus stops must be rebuilt to ensure the traffic of new, low-floor vehicles, in accordance with accessibility requirements. The tenderer notes that the physical construction is considered a construction investment subject to a permit. At the stops in addition, some other developments and track renovations are also part of the task. The stops to be rebuilt: H1 - Corvin körút H2 - Lehel utca H3 - Hengersor utca (combination of Lajosmizsei serompó and Tinódi utca stops) H4 - Margó Tivadar utca H5 - Kemény Zsigmond utca H6 - Thököly út In the vicinity of the reconstructed stops, the superstructure of the tram track must be rebuilt by replacing the bedding, rails and switches, and the necessary substructure repair and track control work must also be carried out. The concerned sections' pedestrian and road crossings, as well as track drainage equipment, must be rebuilt. New platform equipment, 0.4 kV power supply and partly new lighting are being built on the platforms. The parallel road and sidewalks in the vicinity of the listed stops must be renovated. THE bus stops next to tram stops will also be rebuilt. The location of the pedestrian crossings leading to the platforms changes in some places, some pedestrian crossings are closed and new ones are built. In the affected traffic light junctions ...
Document Type: Contract Notice Reference Number: EKR001942772024 Contract Type: works Authority Type: body-pl Doc Title: 50-es villamosvonal peronfelújítás, II-es ütem Dispatch Date: 2026-07-17 Publish Date: 2026-07-20 Submission Date: 2026-08-07
Documents
Tender Notice