Procurement Summary
Country: USA
Summary: Trade Package - Terminal 3 West Modernization Project - Tp C31 - C4c Site Work, Paving and Striping
Deadline: 17 Apr 2026
Posting Date: 20 Mar 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 138148803
Document Ref. No.: 10071.76 - TP C31
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_detailsLogin to see details
Tender Details
Design-Builder Firm Name: Turner Construction CompanyProject Overview:Terminal 3 West ModernizationThe goal of this project is to expand Terminal 3 by approximately 631, 022 gross square feet and to renovate approximately 516, 644 gross square feet of the existing facility. The terminal will remain in operation throughout the project and will require extensive phasing. This will include upgrading building systems, seismic retrofit, improving passenger flow, enhancing the passenger experience, and new gates to maximize flexibility.Courtyard 4 Connector (C4C)The Courtyard 4 Connector (C4C) Project is a new 7-story core-and-shell building, part of the overall Terminal 3 West (T3W) Modernization Project. The T3W Project is a continuation of the Terminal 3 (T3) Program at San Francisco International Airport (SFO), which began with renovations and expansions of Boarding Area E (BAE) and Terminal 3 East (T3E). The T3W Project will renovate the western half of Terminal 3 to the same level of passenger experience that was achieved in the other airport terminal projects.The Courtyard 4 Connector Building will be built between Terminal 3 and the International Terminal (ITB) and will include secure passenger corridors and baggage handling systems connecting T3 and ITB. Additionally, the project will consist of space for offices, assembly (passenger lounges), airport employee amenity space, Customs & Border Protection (CBP) One-Stop passenger security screening checkpoint, loading dock, rooftop mechanical penthouse, and mechanical system upgrades within the existing pump station. Level 1 of C4C is open to the airfield and apron program while levels 2 and 3 are directly connected to T3 and are considered as an extension of that building for egress and plumbing fixture provisions.Trade Package No.: C31Trade Package Title: C4C Site Work, Paving and StripingDescription of the Trade Package Scope of Work: This scope includes all demolition, paving, and striping required to support the ...