Trade Package - Terminal 3 West Modernization Tender - 138148803

The DESIGN-BUILDER has issued a Tender notice for the procurement of a Trade Package - Terminal 3 West Modernization Project - Tp C31 - C4c Site Work, Paving and Striping in the USA. This Tender notice was published on 20 Mar 2026 and is scheduled to close on 17 Apr 2026, with an estimated Tender value of Refer Document. Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 138148803, while the tender notice number is 10071.76 - TP C31 and Registering on the platform.

Expired Tender

Procurement Summary

Country: USA

Summary: Trade Package - Terminal 3 West Modernization Project - Tp C31 - C4c Site Work, Paving and Striping

Deadline: 17 Apr 2026

Posting Date: 20 Mar 2026

Other Information

Notice Type: Tender

TOT Ref.No.: 138148803

Document Ref. No.: 10071.76 - TP C31

Competition: ICB

Financier: Self Financed

Purchaser Ownership: Public

Tender Value: Refer Document

Purchaser's Detail

Name: Login to see tender_details

Address: Login to see tender_details

Email: Login to see tender_detailsLogin to see details

Tender Details

Design-Builder Firm Name: Turner Construction CompanyProject Overview:Terminal 3 West ModernizationThe goal of this project is to expand Terminal 3 by approximately 631, 022 gross square feet and to renovate approximately 516, 644 gross square feet of the existing facility. The terminal will remain in operation throughout the project and will require extensive phasing. This will include upgrading building systems, seismic retrofit, improving passenger flow, enhancing the passenger experience, and new gates to maximize flexibility.Courtyard 4 Connector (C4C)The Courtyard 4 Connector (C4C) Project is a new 7-story core-and-shell building, part of the overall Terminal 3 West (T3W) Modernization Project. The T3W Project is a continuation of the Terminal 3 (T3) Program at San Francisco International Airport (SFO), which began with renovations and expansions of Boarding Area E (BAE) and Terminal 3 East (T3E). The T3W Project will renovate the western half of Terminal 3 to the same level of passenger experience that was achieved in the other airport terminal projects.The Courtyard 4 Connector Building will be built between Terminal 3 and the International Terminal (ITB) and will include secure passenger corridors and baggage handling systems connecting T3 and ITB. Additionally, the project will consist of space for offices, assembly (passenger lounges), airport employee amenity space, Customs & Border Protection (CBP) One-Stop passenger security screening checkpoint, loading dock, rooftop mechanical penthouse, and mechanical system upgrades within the existing pump station. Level 1 of C4C is open to the airfield and apron program while levels 2 and 3 are directly connected to T3 and are considered as an extension of that building for egress and plumbing fixture provisions.Trade Package No.: C31Trade Package Title: C4C Site Work, Paving and StripingDescription of the Trade Package Scope of Work: This scope includes all demolition, paving, and striping required to support the ...

Documents

 Tender Notice


Request Demo
GiZ Tenders India

Procurement Documents for USA

Access a comprehensive library of standard procurement documents specific to USA. Here, you'll find all the essential forms, guidelines, and templates required for tender applications and submissions in USA

Explore Procurement Documents for USA


Want To Bid in This Tender?

Get Local Agent Support in USA and 60 More Countries.

View All The Services


View Tenders By


Publish Tenders


Have Any Dispute With The Purchaser?