Procurement Summary
Country: USA
Summary: Trade Package - Sfo Recycled Water System Project - Tp 4006 -Doors
Deadline: 14 Aug 2025
Other Information
Notice Type: Tender
TOT Ref.No.: 122800007
Document Ref. No.: 11431.66 - TP4006
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
Design-Builder Firm Name: Walsh Construction Co. II, LLC.Project Overview:The Recycled Water Systems Project will design and construct an Advanced Water Treatment Plant (AWTP) to meet Title 22 requirements for recycled water and remove per-and polyfluoroalkyl substances (PFAS) from the effluent. The project will also design and construct a 250, 000-gallon storage tank, pump station, and distribution system of roughly three miles of pipeline and connections to some of the Airports facilities. The project will also include upgrades to three existing Sequence Batch Reactors (SBR) and the construction of one new SBR for permit compliance.This is a Progressive Design-Build Project where Trade Work is incrementally authorized by Airport. The goal of this project is to design, construct, permit, activate, commission, and closeout of the new construction for the Recycled Water System Project.The new AWTP and SBR upgrade will exist in the current Mel Leong Treatment Plant (MLTP). The MLTP includes parallel treatment processes for wastewater produced from Airport facilities. The Industrial Wastewater Treatment Plant (IWTP) treats industrial wastewater and first-flush storm water runoff; and the Sanitary Wastewater Treatment Plant (SWTP) treats sanitary sewer flows.Trade Package No.: TP-4006Trade Package Title: DoorsDescription of the Trade Package Scope of Work:BASE SCOPEInstallationFurnish and install all door material types per drawings and specifications. See door schedule for finishes and frames on drawing A9.05.Furnish and install anchors and silencers.Furnish and install mullions and transoms as indicated in the drawings and specifications.Furnish and install door sidelites.Furnish and install 45 min. Fire rated door at electrical room.Furnish and install jamb anchors.Furnish and install astragals for double doors per drawings.Coordinate automatic door actuators installation with electrical subcontractor.Furnish and install door shoe with track and vinyl seal for storefr...
Documents