Procurement Summary
                          Country:  Belgium
                          Summary: To/Inv/Rup/1/U1_Rupelt Tunnel - Construction of a Temporary Dry Fire Pipeline
                          Deadline: 11 Sep 2025
                          Other Information
                          Notice Type: Tender
                          TOT Ref.No.: 123864094
                          Document Ref. No.: TO/INV/RUP/1/U1_pub01
                          
                          Financier: Self Financed
                          Purchaser Ownership: Public
                          Tender Value: Refer Document
                          Purchaser's Detail
                                Name: Login to see tender_details
                                Address: Login to see tender_details
                                Email: Login to see tender_details
Login to see detailsTender Details
                                Providing a temporary dry burning line in both tunnel ducks of the Rupeltunnel. The original hydrant management in both tunnel dokers of the Rupeltunnel were tackled from the central Pidpa city waters that runs through the service tunnel. Due to persistent leaks through corrosion, From both the central PIDPA city waters and the drained hydrant management, it has been decided to remove these pipes in the tunnels, so that only the outdoor hydrants in the central reservation on both frontons are fed by the city water. To replace this out of service The Hydranten pipe taken the intention is to install a temporary dry flexible burning line during the period of the renovation work on the outdoor wall in each tunnel poker with a possibility every 40 or 60 m to use DSP 110 on this burning line with the help of DSP 110 links by being able to top up the fire brigade. This temporary burning line must be built up by means of connected dry flexible fire pipes, on which the fire brigade can connect. The total length of the temporary dry flexible fire pipes to be constructed is 1200lm, being the total length of the two tunnel dokers. To feed the dry flexible burning line, the fire brigade will use a car pump. To ensure that the connection of the car pump between the outdoor hydrant and the temporary flexible burning management run efficiently aa...
General purpose: Competition
Specific purpose: Contract or concession - standard regime
Initially dispatched at: 04/08/2025
Last dispatched at: 04/08/2025
                          Documents
                
                           Tender Notice
                          f8d96fc8-bfde-4d35-a42d-c41f8bfe341d.zip
notices_f8d96fc8-bfde-4d35-a42d-c41f8bfe341d.zip