JAVNE SLUŽBE PTUJ, PODJETJE ZA IZVAJANJE GOSPODARSKIH JAVNIH SLUŽB IN DRUGIH DEJAVNOSTI, D.O.O. has floated a tender for The Contracting Authority wishes to transform the existing district heating system into an "energy efficient district heating system" as required by the applicable Energy Act (EZ-1). The project envis.... The project location is Slovenia and the tender is closing on 27 Nov 2020. The tender notice number is JN008237/2019-A01, while the TOT Ref Number is 38350109. Bidders can have further information about the Tender and can request the complete Tender document by Registering on the site.

Expired Tender

Procurement Summary

Country : Slovenia

Summary : The Contracting Authority wishes to transform the existing district heating system into an "energy efficient district heating system" as required by the applicable Energy Act (EZ-1). The project envis...

Deadline : 27 Nov 2020

Other Information

Notice Type : Tender

TOT Ref.No.: 38350109

Document Ref. No. : JN008237/2019-A01

Competition : ICB

Financier : Self Financed

Purchaser Ownership : -

Tender Value : Refer Document

Purchaser's Detail

Purchaser : JAVNE SLUŽBE PTUJ, PODJETJE ZA IZVAJANJE GOSPODARSKIH JAVNIH SLUŽB IN DRUGIH DEJAVNOSTI, D.O.O.
Mailing address::-Ulica heroja Lacka 3
City:-Ptuj
Postal Code:-2250
Country:-Slovenija
Contact Person:-Svetlana M. Zupanič
Telephone:-+386 26207344
Fax:-+386 26207331
Slovenia
Email :svetlana.milosevic@js-ptuj.si
URL :http://www.js-ptuj.si

Tender Details

The Contracting Authority wishes to transform the existing district heating system into an "energy efficient district heating system" as required by the applicable Energy Act (EZ-1). The project envisages two phases: Phase I. Reconstruction and completion of the existing district heating boiler Phase II. Construction of the hot water network Short description: Phase I envisages the reconstruction of the existing boiler room by removing one of the three gas boilers from the boiler room (each boiler is of the order of 7 MW) and replaced with a new boiler of wood biomass (wood chips) of the order of power. 2.5 3.0 MW. LA wood chips depot, a space for a hydraulic plant and a room for flue gas filtration are being built next to the boiler room. As part of Phase II. it is also envisaged to replace the second gas boiler with a new gas boiler of the order of 6 MW. Phase II. envisages the construction or. extension of heating networksa, namely the construction of hot water pipes in the total length of approx. 1, 700 m, divided into Route T1, T2


Place of performance : SI - SLOVENIA
Main location or venue: Ptuj Municipality


Time limit for receipt of tenders or requests to participate : 2020-11-27

Documents

 Tender Notice