Procurement Summary
Country: USA
Summary: The Collective Off Rome Development Infrastructure Work
Deadline: 29 Jan 2026
Posting Date: 30 Dec 2025
Other Information
Notice Type: Tender
TOT Ref.No.: 132861585
Document Ref. No.: PE-62250-NONST-2026-000000012
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
This Project Consists Of Demolition And Removal Of Existing Public Sewer Main And Storm Drainage Networks, And The Proposed Improvements Include Storm Sewer, Sanitary Sewer, And Water Utility Infrastructure. These Improvements Will Be Constructed Along Two New Local Streets That Will Connect W. White St And Abby Lane. The Demolition And Removal Of Storm Sewer Networks Consist Of Approximately 201 Lf Of Pipe And 3 Structures. The Installation Of Proposed Storm Sewer Networks Consists Of Approximately 1900lf Of Pipe, And 27 Structures. The Demolition And Removal Of Sanitary Sewer Networks Consist Of Approximately 1207 Lf Of Pipe And 4 Structures. The Installation Of Sanitary Sewer Networks Consists Of Approximately 1343 Lf Of Pipe And 10 Structures. The Installation Of Public Water Main Consists Of Approximately 1633 Lf Of Pipe, 4 Fire Hydrants, And 56 Water Service Lines And Meters. The Contractor Will Be Required To Maintain Good Communication And Coordination With The Project Engineer And City Engineer Through The Entire Duration Of Construction Activity
NIGP Discription: Maintenance And Repair, Sewer And Storm Drain, Including Removal, Public Utilities: Water, Sewer And Gas Maintenance And Repair Services, Construction, Sewer And Storm Drain
Start Date (ET) : Dec 29, 2025 @ 12:36 PM
Documents
Tender Notice