Procurement Summary
Country: Ireland
Summary: Tender for Project Shine for the Design, Supply and Install of Fire Suppression and Fire Abatement System at Medite Europe Dac ‘26
Deadline: 09 Jul 2026
Posting Date: 12 Jun 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 143162091
Document Ref. No.:
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
CPV Classification
51700000 - Installation services of fire protection equipment
45343000 - Fire-prevention installation works
35111500 - Fire suppression system
45312100 - Fire-alarm system installation work
45343200 - Firefighting equipment installation work
31625100 - Fire-detection systems
44482000 - Fire-protection devices
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
MEDITE Europe DAC is investing in new plant and equipment under the title Project Shine. Project Shine involves the installation of the following: • Wet fuel handling systems. • Dry Fuel handling systems. • 56MW Biomass Energy Plant. • MDF Core + face dryers. • Services + utilities to the above, mainly: o Electrical distribution MCC-s o Compressed air o Water treatment systems o Fire detection + suppression o Natural Gas o Steam Project Shine has commenced the construction phase of Project Shine and proposals are sought for the supply of Fire Protection and Suppression to the various plant, equipment and buildings. The scope involves designing the fire protection systems to deliver the required volumes and density in order to comply with relevant standards. Medite DAC complies with NFPA standards and all equipment/pipework/valves/fittings etc are all FM approved. Existing Setup MEDITE-S existing fire mains schematic can be seen in Appendix 3. The system is designed to and complies with NFPA standards. The system comprises of: • 1 no. 1, 500 GPM/125 PSI Mather + Pratt electric pump. • 1 no. 1, 500 GPM/125 PSI Mather + Pratt diesel pump. • 200mm diameter ring main. • Various PIV, AV-s and fire hydrants. • The system is configured as a dry system. Scope of work The Scope of Work is to design, supply + install fire suppression/protection to the following areas: 1) Wet Fuel Equipment (estimated availability date Jun-27): o Wet Fuel from yard system o On-site Chipping System o Chipped Truck Delivery System o 51.270 Reject conveyor head + tail deluge (push button from control room) o 51.310 Tube conveyor feeding existing line #2 energy plant head + tail deluge (push button from control room) o 51.250 Tube conveyor feeding energy plant walking floor head + tail deluge (push button from control room) 2) Dry Fuel System (estimated availability date Jun-27): o 1 no. Edge Trim Silo: o 1 no. Dust Silo o Supply to each spark extinguisher spray nozzle (where runs are external the ne...
Procedure : Open
Publication Date : 09/07/2026
Deadline : 09/07/2026 15:00:00
Documents
Tender Notice