Procurement Summary
Country: Ireland
Summary: Tender for the Design, Supply and Installation of Fire Extinguishing (Suppression) Systems in 3 Mcc Rooms at Medite Europe Dac ‘26
Deadline: 01 May 2026
Posting Date: 14 Apr 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 139495899
Document Ref. No.: 252185-2026
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: EUR 165000
CPV Classification
51700000 - Installation services of fire protection equipment
45343000 - Fire-prevention installation works
35111500 - Fire suppression system
45312100 - Fire-alarm system installation work
45343200 - Firefighting equipment installation work
31625100 - Fire-detection systems
31625200 - Fire-alarm systems
44482000 - Fire-protection devices
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
Tender for the Design, Supply and Installation of Fire Extinguishing (Suppression) Systems in 3 MCC Rooms at MEDITE Europe DAC ‘26
MEDITE Europe DAC are looking for suitably qualified Fire suppression companies to install suppression systems in the following Motor Control Centre (MCC) rooms across the Medite plant. • Anner HV Sub-Station • Fire-Pump House MCC • Line1 post-press MCC Project Background Mandatory Insurance Requirement Medite electrical distribution network comprises 17 Motor Control Centre rooms, and the main HV Switch-room located at Anner Substation. (See MCC layout drawing in Appendix 3). A number of these MCCs and the main Switch-room are considered higher impact and risk, due to the criticality of the processes they support and the ageing condition of the installed switchgear and associated cooling systems. Overall Program Objectives The multi-year goal of this program is to ensure that all site MCC + HV switch-room comply with legislative requirements and industry best practice for extinguishing electrical fires automatically. It is proposed to install a similar Clean Agent gaseous suppression system with appropriate smoke detection in all MCC rooms, starting with those with critical switchgear. Program estimated to take 4 years. The program scope includes: • Design of suppression system for each room considering: Size and fabric of structure Presence of a floor void(s) or not Age + condition of switchgear (risk of overheating + fire) Ability ...
Document Type: Contract Notice
Contract Type: services
Estimated Value: 165000 - EUR
Authority Type: spec-rights-entity
Doc Title: Tender for the Design, Supply and Installation of Fire Extinguishing (Suppression) Systems in 3 MCC Rooms at MEDITE Europe DAC ‘26
Dispatch Date: 2026-04-10
Publish Date: 2026-04-14
Submission Date: 2026-05-01
Documents
Tender Notice