Procurement Summary
Country: Canada
Summary: Tchc 300 Dufferin- Envelope B- Bp-03-Conc. Formwork/Concrete Supply/ Rebar
Deadline: 26 Mar 2026
Posting Date: 25 Mar 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 138393785
Document Ref. No.: BP-03 Adden 2
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_detailsLogin to see details
Tender Details
Addendum 2RFP Timeline- Envelope B and C The RFP Timeline has been changed to the following: Envelope B Tender Close date is Thursday March 26, 2026 @2:00pm. Envelope C Tender Close date is Wednesday April 1, 2026 @2:00pm.Design, supply, form, reinforce, place, finish, cure, and repair all cast-in-place structural concrete including footings, pile caps, foundation walls, columns (existing wall and helical pile supported), suspended slabs and balconies (Levels 2-3), complete with engineered formwork/falsework and reshoring. Includes all reinforcing steel, epoxy dowels, thermal break systems, embeds, grout, slab infills/make-goods, architectural finishes, and concrete repairs, in full compliance with CSA standards and structural drawings Interior and exterior refresh of existing 7 floor apartment building. Scope includes replacement of building façade, roofing system, doors & windows, interior finishes, plumbing fixtures, and HVAC system. New landscaping including new courtyard layout, playground, and waste enclosure. Townhouses are not in scope.
Reference Number : 0000318372 Location : Canada, Ontario, Toronto Job Location : 300 Dufferin, Toronto Description : Addendum 2RFP Timeline- Envelope B and C The RFP Timeline has been changed to the following: Envelope B Tender Close date is Thursday March 26, 2026 @2:00pm. Envelope C Tender Close date is Wednesday April 1, 2026 @2:00pm.Design, supply, form, reinforce, place, finish, cure, and repair all cast-in-place structural concrete including footings, pile caps, foundation walls, columns (existing wall and helical pile supported), suspended slabs and balconies (Levels 2–3), complete with engineered formwork/falsework and reshoring. Includes all reinforcing steel, epoxy dowels, thermal break systems, embeds, grout, slab infills/make-goods, architectural finishes, and concrete repairs, in full compliance with CSA standards and structural drawings Interior and exterior refresh of existing 7 floor apartment building. Scope includes replacement of building façade, roofing system, doors & windows, interior finishes, plumbing fixtures, and HVAC system. New landscaping including new courtyard layout, playground, and waste enclosure. Townhouses are not in scope. :
Documents
Tender Notice