Procurement Summary
Country: USA
Summary: Taxiway a West Extension
Deadline: 23 Apr 2026
Posting Date: 25 Mar 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 138383861
Document Ref. No.: 2026-015-ITB
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
Sanford Airport Authority (IATA: SFB, ICAO: KSFB, FAA LID: SFB) is in Sanford, Florida, United States, near Orlando. It was built as Naval Air Station Sanford, a Master Jet Base for carrier-based attack and reconnaissance aircraft until 1969. The airport is owned and operated by the Sanford Airport Authority. It is a base for Allegiant Air. Sanford is Orlandos secondary commercial airport, with proximity to downtown Orlando and the major theme parks (Walt Disney World, Universal Orlando Resort, and SeaWorld Orlando. Because of the affiliation with Orlando, passenger traffic at Sanford was once dominated by European charter services. Since 2008, however, most of its passenger traffic has been domestic; this is attributable to the entrance of Las Vegas-based Allegiant Air, for which Sanford is a focus city.The Sanford Airport Authority (Owner) has a Cone of Silence applicable to all competitive procurement processes which places restrictions on communications. Refer to the Cone of Silence in the Solicitation document for more information. All inquiries regarding this Solicitation must be submitted in writing to the Procurement Agent assigned to this Solicitation. The Bidder must supply all information and documents required by the Solicitation documents through the Owner-s e-Procurement Portal located at https://secure.procurenow.com/portal/flysfb by the Bid Submittal Time and Date.The Sanford Airport Authority (SAA) is soliciting competitive, sealed proposals from interested and qualified firms to provide construction services for the Taxiway A West Extension project, which includes the following items:Extend Taxiway A to the west approximately 3, 950 feet. Construct new Taxiway A1, connector between Taxiway A and the runway end.Design taxiway edge lighting and signage to accommodate changes the proposed taxiway extension.Modifications to the existing airfield electrical vault equipment to support additional load.Design stormwater dry retention pond for treatment of p...
Documents
Tender Notice