Procurement Summary
Country : USA
Summary : Taunton Camera Network Upgrade
Deadline : 24 Apr 2025
Other Information
Notice Type : Tender
TOT Ref.No.: 117482464
Document Ref. No. : BD-25-1035-DYS01-DYS01-115242
Financier : Self Financed
Purchaser Ownership : Public
Tender Value : Refer Document
Purchaser's Detail
Name :Login to see tender_details
Address : Login to see tender_details
Email : Login to see tender_details
Login to see detailsTender Details
Bulletin Desc : Taunton Camera Network Upgrade Prevailing Wage Rates Required, Rate Sheet will be added asap Install new OM4 Multimode Fiber Optic Backbone from the Basement server room to network closets on floors 1, 2, 3 and 4 Fiber will terminate in a new enclosure in the server rack in the basement, and in new enclosures in existing closets on floors 1, 2, 3, and 4 Install new switches as outlined below, replacing existing re-patching all current connections
Bid Number: : BD-25-1035-DYS01-DYS01-115242
Bid Opening Date : 04/24/2025 11:00:00 AM
Location : DYS01 - Boston Fiscal Year 25 Type Code NS - Non-Statewide Solicitation Allow Electronic Quote Yes Alternate Id Required Date Available Date 04/09/2025 124509 PM Info Contact Bid Type OPEN Informal Bid Flag No Purchase Method Open Market Pre Bid Conference Bulletin Desc Taunton Camera Network Upgrade Prevailing Wage Rates Required, Rate Sheet will be added asap Install new OM4 Multimode Fiber Optic Backbone from the Basement server room to network closets on floors 1, 2, 3 and 4 Fiber will terminate in a new enclosure in the server rack in the basement, and in new enclosures in existing closets on floors 1, 2, 3, and 4 Install new switches as outlined below, replacing existing re-patching all current connections Ship-to Address Department of Youth Services- Boston Office600 Washington St4th floorBoston, MA 02111USEmail eva.lada@state.ma.usPhone (617) 960-3266 Bill-to Address Department of Youth Services- Boston Office600 Washington St4th floorBoston, MA 02111USEmail eva.lada@state.ma.usPhone (617) 960-3266 Print Format Required Quote Attachments SBPP (Small Business Purchasing Program) Eligible? NO See SBPP requirements and exceptions at www.mass.gov/sbpp Item Information Item # 1 ( 83-11 - 23 ) Install new OM4 Multimode Fiber Optic Backbone form the Basement server room to network closets on floors 1, 2, 3 and 4 Fiber will terminate in a new enclosure in the server rack in the basement, and in new enclosures in existing closets on floors 1, 2, 3, and 4 Install new switches as outlined below, replacing existing re-patching all current connections Basement (2) 24 Port PoE+ switches, stacked, each with (8) 10GigE Dual 10GigE connection to each floor-one from each switch (1st, 2nd, 3rd, 4th) Dual 10GigE to each of (3) archivers (BCD/Dell)-one from each switch 1st Floor (hot room) (1) 48 Port PoE+ switch with (2) 10GigE connections (1) 24 Port PoE+ switch stacked to above...
Documents
Tender Notice