Procurement Summary
Country: Poland
Summary: Szczecin Ul. Krygiera - Comprehensive Execution of Directional Drilling for a Dn 400 Pe Pipe.
Deadline: 15 May 2026
Posting Date: 01 May 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 140468836
Document Ref. No.: WNP-000902 - przewiert Szczecin
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_detailsLogin to see details
Tender Details
Comprehensive execution of directional drilling in Szczecin at ul. Krygier for the DN 400 PE SDR 11 PP pipeline with a length of approx. 110 m. The scope of work includes in particular: • construction of control trenches, restoration of the surface and terrain after completion works, • discovery of full underground infrastructure along the planned drilling route, with particular emphasis on the DN500 gas network and DN1200 water supply network, restoration of the surface and terrain after completion of the works, • verification of the attached drilling profile in relation to the uncovered infrastructure, • construction of a starting and receiving chamber for the drilling, • construction of excavations for the drilling fluid, • delivery and assembly of the pulling head, • construction of a directional drilling with the introduction of a DN400 PE SDR 11 service pipe, • disposal generated waste and mud, • preparation of as-built documentation containing the drilling profile, • ensuring proper supervision of the work performed, • land occupation and permits to enter the area, • cutting down trees and bushes, • restoring the surface and terrain after completion of drilling works, • reporting to industry supervision. Implementation conditions: 1. The contractor is obliged to perform inspection trenches and discover the full underground infrastructure immediately after signing the contract, however no later than June 15, 2026. 2. The attached drilling profile is an estimate. 3. After completing the inspection trenches, the Contractor is obliged to correct it and/or accept it in writing. 4. Deadline for verification...
Documents
Tender Notice