Procurement Summary
Country : Switzerland
Summary : Submarine Cable Replacement Ltg. 150 Kv between the Morcote and Brusino Portals Delivery, Assembly and Dismantling of the Cables and Cable Sets
Swissgrid Ag
Deadline : 06 Nov 2023
Other Information
Notice Type : Tender
TOT Ref.No.: 88933528
Document Ref. No. : 1361597
Financier : Self Financed
Purchaser Ownership : Public
Tender Value : Refer Document
Purchaser's Detail
Name :Login to see tender_details
Address : Login to see tender_details
Email : Login to see tender_details
Login to see detailsTender Details
Supply of Ht cables and accessories Supply of all materials necessary for connecting the Nvx cables to the existing overhead line supply of two optical fiber cables (72 fibers) and an earthing cable Laying and assembly of Ht cables, Grounding Cable And Fibre Optique Development And Implementation Of The Monitoring Concept Carrying Out Tests In Accordance With Testing Requirements Impedance Measurement Of New SBB And Swissgrid Lake Cable Lines Dismantling Of Existing Cable Installations Project Coordination InspectionSubmarine Cable Blocks and DocumentationSupply of Complete DocumentationThe complete list and full details are included in Document C100.
Applicant Department/Contracting Entity: Swissgrid AGOrganizing Department/Organizing Entity: Swissgrid AG, to the attention of Katia Schmidlin, Bleichemattstrasse 31, 5001 Aarau, Switzerland, Telephone: 41 58 580 21 11, E-mail: katia.schmidlin@swissgrid. ch
Publish Date:15.09.2023
Object of the contract
2.1 Genre of the supply contract: Works contract
2.2 Title of the contract project: Seekabelersatz Ltg. 150 kV between the Morcote and Brusino portals Delivery, assembly and disassembly of the cable and cable sets
2.3 Reference / project number: 7000000247
2.4 Market divided into lots?: No
2.5 Common public procurement vocabulary:
2.6 Purpose and scope of the contract: Supply of HV cables and accessories Supply of all materials necessary for connecting the new cables to the existing overhead line Supply of two fiber optic cables (72 fibers) and 'a cablee earthing Laying and assembly of HV cables, earthing cable and optical fiber Development and implementation of the monitoring concept Carrying out checks in accordance with the control requirements Measurement of the impedance of the new lake cable lines of the SBB and SwissgridDdismantling of existing cable installationsProject coordinationUnderwater inspection of cable blocks and documentationSupply of complete documentationThe full list and all details are included in document C100.
2.7 Place of supply: Morcote and...
Documents
Tender Notice