Procurement Summary
Country: Finland
Summary: Structural Design Krs Högstaedieskola Och Gymnasium
Deadline: 15 May 2026
Posting Date: 09 Apr 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 139247236
Document Ref. No.: 241315-2026
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: EUR 66666
CPV Classification
71240000 - Architectural, engineering and planning services
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_detailsLogin to see details
Tender Details
Middle school The middle school will be implemented as a new building. The size class of the school is estimated at 3400 m2. The number of students in the school must be sized for 100 students and 35 staff. Among other things, the following premises must be included -class spaces and their Ancillary spaces - kitchen facilities and a dining room -Gymnasium and changing and washing facilities - technical facilities - population protection Sculpture hall, metal class does not need to be taken into account. The old premises will be left when the current school next door is demolished. The space to be left must be planned for e.g. new entrance, toilet facilities and technical space. (See appendix 9, the craft wing to be left). The new outer wall with foundations and the new slopes of the water roof must be taken into account in the plans. The structures of the old lobby will be repaired for moisture damage. The location of the building is revealed from the station drawing, appendix 3. The building is planned next to the existing school to be demolished and partially at the site of the school to be demolished. The chosen architect's preliminary sketch of the middle school will be delivered together with the answers to the other questions. High school An existing high school is located on the same plot as the current middle school. The high school was built in 1924-1925 and was designed by architect Lars Sonck. The building has 2 ½ floors. The size of the high school is approx. 3000 m2 and the building is marked SR-3 in the plan, so the Museum Agency will be involved in planning. Appendix 4. Extensive microbial damage has been found in the building and all intermediate floors must be opened. In addition, all technology must be renewed. The shell of the outer shell needs to be repaired...
Document Type: Contract Notice Reference Number: 608322 Contract Type: services Estimated Value: 66666 - EUR Authority Type: la Doc Title: Rakennesuunnittelu Krs högstadieskola och gymnasium Dispatch Date: 2026-04-08 Publish Date: 2026-04-09 Submission Date: 2026-05-15
Documents
Tender Notice