Procurement Summary
Country: Czech Republic
Summary: Strengthening of Resources and Streamlining the Function of the Water Supply Choustníkovo Hradiště so 03 Recirculation of the Water Supply Network - Apartment Block Stage
Deadline: 10 Aug 2026
Posting Date: 18 Jul 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 145411506
Document Ref. No.:
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_detailsLogin to see details
Tender Details
The subject of the order is the construction of the connecting line "Stašák" (PE Ø 160) between the existing backbone line Ø 160 running along road III/29923 from the reservoir "U Millerů" and the backbone line Ø 90 from the reservoir "Pod Kocbeří". The route is from Olfincar, where after crossing the local the communication will connect to the existing rows of Ø 90 from the VDJ "Pod Kocbeří" at the apartments. At the point of connection to the Ø 90 lines from VDJ "Pod Kocbeří", a connection will also be made to the parallel Ø 63 line. This line will be terminated by this connection and the rest of its route will be shut down from operation. A total of 2 DN 80, 1 DN 150 and 1 DN 50 gate valves will be installed here. The installed shutters will allow more options for supplying the consumer during shutdowns and network failures. As part of the construction, the node, on which there are now two armatures, will be modified shafts at apartment building No. 50. All fittings and fittings will be dismantled in the square shaft. The existing T-piece DN80/80 will be replaced by a new one with a reduced branch (DN80/50). The branch will be connected to the existing Ø 63 pipe running along the road to the rectory, a connection for the nursery Ø 40 and for now also the pipe to the former shop Ø 40. New caps will be installed on all these pipes in the shaft. In a straight direction, the DN 80 pipeline will continue out of the shaft from the T-piece, the route will break behind the shaft and end at the edge of the existing paved surfaces. The above-ground sewage hydrant will be located here. Both Ø 63 connections for apartment buildings No. 50 and 51 will be connected to this pipe. Each will be equipped with an earth connection cap. All fittings and fittings will be dismantled in the circular shaft, it will then be canceled and buried. Modification of this node can only be done after the "Stašák" connecting line has been completed and put into operation. The water connection for ...