Cross Icon
Cross Icon

Steam Boiler Fnsp Description: the Subject Tender - 141225090

The MH TEPLARENSKY HOLDING, A.S. has issued a Tender notice for the procurement of a Steam Boiler Fnsp Description: the Subject of the Work is the Solution to the Installation of One New Three-Pass Flame Tube Steam Boiler with Accessories, Output Approx. 4000 Kg/Hour (The Exact Output Value will Be... in the Slovakia. This Tender notice was published on 14 May 2026 and is scheduled to close on 16 May 2026, with an estimated Tender value of EUR 911483.31. Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 141225090, while the tender notice number is 6714 - VST and Registering on the platform.

Expired Tender

Procurement Summary

Country: Slovakia

Summary: Steam Boiler Fnsp Description: the Subject of the Work is the Solution to the Installation of One New Three-Pass Flame Tube Steam Boiler with Accessories, Output Approx. 4000 Kg/Hour (The Exact Output Value will Be...

Deadline: 16 May 2026

Posting Date: 14 May 2026

Other Information

Notice Type: Tender

TOT Ref.No.: 141225090

Document Ref. No.: 6714 - VST

Competition: ICB

Financier: Self Financed

Purchaser Ownership: Public

Tender Value: EUR 911483.31

Purchaser's Detail

Name: Login to see tender_details

Address: Login to see tender_details

Email: Login to see tender_details

Login to see details

Tender Details

STEAM BOILER FNSP Description: The subject of the work is the solution to the installation of one new three-pass flame tube steam boiler with accessories, output approx. 4000 kg/h (the exact output value will be determined when drawing up the DRS, with regard to optimization operating parameters during summer and winter operation), with an integrated stainless economizer in the space of the current gas steam boiler plant of NsP Zilina. The mentioned new boiler will be installed in the boiler room, instead of the dismantled ČKD 6 t/h boiler. The new boiler will serve for the production of medium-pressure saturated steam, which will be used for air conditioning heating and technological purposes, in individual objects of FNsP Zilina. When replacing the new boiler with a ČKD 6 t/h flood boiler, the output of the boiler room will decrease. We assume that the current ventilation and the existing exhaust area is satisfactory from the point of view of work safety and will not be interfered with during the reconstruction of the boiler house. Part of the work implementation is the installation of a new water treatment plant to ensure the water quality requirements of the boilers. Accessories boilers is a feed water heat treatment system, a drain and cooling module, a condensate module, a feed pump pump module (2 pumps), a condensate pump pump module (2 pumps) and a condensate quality monitoring module. Stated technology it is further supplemented by a water and condensate treatment plant and an expansion filling machine. The boiler room will be operated with occasional maintenance. According to STN 07 0703, this is a category I gas boiler room, located in a free-standing building, with natural ventilation with 3-fold air exchange, with exhaust surfaces, with natural gas leakage indicators. More detailed information is provided in the tender documents for this order. Order type: Goods Additional order type Additional order type Additional order type: Services Additional type ...
Estimated value: 911, 483.31

Documents

 Tender Notice


Request Demo
GiZ Tenders India

Procurement Documents for Slovakia

Access a comprehensive library of standard procurement documents specific to Slovakia. Here, you'll find all the essential forms, guidelines, and templates required for tender applications and submissions in Slovakia

Explore Procurement Documents for Slovakia


Want To Bid in This Tender?

Get Local Agent Support in Slovakia and 60 More Countries.

View All The Services


View Tenders By


Publish Tenders


Have Any Dispute With The Purchaser?